Difference Between MRP VS MPS

xiaoxiao2021-03-06  37

Difference between MRP vs MPS The following might help in explaining the difference between MPS and its counter part MRP Master Production Schedule (MPS):. The master production schedule is a line on the master schedule grid that reflects the anticipated build schedule for those items assigned to the master scheduler. The master scheduler maintains this schedule, and in turn, it becomes a set of planning numbers that drives material requirements planning. It represents what the company plans to produce expressed in specific configurations, quantities, and dates. The master production schedule is not a sales item forecast that represents a statement of demand. The master production schedule must take into account the forecast, the production plan, and other important considerations such as backlog, availability of material, availability of capacity, and management policies and goals MASTER SCHEDULE. Material Requirements Planning (MRP): a Set of Techniques That Uses Bill of Mate rial data, inventory data, and the master production schedule to calculate requirements for materials. It makes recommendations to release replenishment orders for material. Further, because it is time-phased, it makes recommendations to reschedule open orders when due dates and need dates are not in phase. Time-phased MRP begins with the items listed on the MPS and determines (1) the quantity of all components and materials required to fabricate those items and (2) the date that Time-phased the components and material are required. .

转载请注明原文地址:https://www.9cbs.com/read-70675.html

New Post(0)