Ago

xiaoxiao2021-03-06  100

I always feel that there are a lot of things to do, step by step.

1. AVP installation package production (Hook, DLL is familiar). 10.19--10.24

2. Management system is perfect. 10.25--11.1

3. Tomcat Cluster Apache Security Module Test. 11.2-11.7

4. Oracle8 -> Oracle9i Migration Performance Adjustment. 11.8-11.15

5. SNMP MRTG. 11.16-11.20

6. Domain Controller SMS 11.20-12.1

7. Intrusion Detection System 12.2-12.15

转载请注明原文地址:https://www.9cbs.com/read-104322.html

New Post(0)