Project2000 Topic Knowledge (1) Schlen Lin (Source Unknown) MICROSOFT Project 2000 Technical Indicator When you run Microsoft Project2000 in Windows 95, Windows 98 or Windows NT, support the following instructions and restrictions (although actual restrictions and running speed) It is largely dependent on the configuration of the computer). It should be noted that the "insufficient memory" error may occur before the limit is reached. Attribute Max Value Each project file number The number of items per item is 1 million per item's resource number of 10 million yuan per work allocated 10,000 units or one million percent of each project file task correlation. The number of pre-tasks of each task is not limited to the subsequent task of each task Unlimited Each project Outline Level Number 65,535 Merge Calculation Item Number 1000 Connect to the number of item files opened in each merged item 1,000 Connect to a resource library Sharing Number of documents 999 (ie the maximum value to open the project file) Open the number of resource library files itself 1) Open window Number 50 Based Calendar Number No limit Each calendar exception calendar number 1,400 monthly printed task number 4,000 supports different payment rates And standard spell-speaking Number Each resource 5 per cost rate number of variable rates in total 25 currency domains 999, 999, 999, 999 Maximum working time value 1,666,666,667 hours maximum work allocation time value: Time assignment 999,999,999 minutes pair Variable Material Distribution 999,999,999 Unit on fixed materials 60,000,000 unit print zoom adjustment range percentage 10 to 500 percentage point page Header text 5 lines page foot text 3 lines page journal text 3 lines page diagram text box width 5 inches (12.7 cm) ) Filtering Conditions of each filter 40 Number of filter conditions per automatic filter Each column 2 can be calculated earliest date 1984, January 1, December 31, December 31, Worksheet View Most Universal Options Number 9 Microsoft Project 2000 Add Function Microsoft's Project 2000 will be launched in the third quarter, this brings chart fully introduces new features that PROJECT 2000 is added to Project 98. 1. The task settings for the new feature of the scheduled Project 98 can be 10 priority, and the Project 2000 now sets the priority of the task to any value from 1 to 1000. You can also apply priority to a project. Project 98 can only set the project calendar and resource calendar, and now you can set the calendar for the task, including working hours. Using the task calendar can create a schedule that only affects the selected task. Now the primary project can calculate the latest completion date across all sub-projects. Use this feature to view a key path within the primary item. In Microsoft Project 2000, you can now view the number of resources within each unit time. This feature is well suited for the available quantity that varies over time to the resource group. You can now set a deadline date, that is, the latest time for the user settings, allows Project 2000 to warn in the absence of a task schedule. The task period can now be input to the expected period, the meaning of the expected period is approximately an estimated period, not a positive value. Users can use the new "Task Task Task" filter that can quickly find the task that may not be determined. Microsoft Project 2000 now divides the resource into two categories, and the material resources are listed separately as a category. You can track all kinds of materials such as wood or concrete, and allocate resources to tasks.
Second, the Improvement of the "Network Diagram" view Microsoft Project view replaces the "PERT Map" in the earlier versions. Filters can now be applied in the Network Map view. In the Network Map view, you can use the outline symbols to hide or display the subtask of the summary task, and the method is similar to displaying the outline in the Gantti view. Microsoft Project 2000 can better control the number of data fields on each node, including the shape of the new node, and provide more node format options. For example, now you can specify up to 16 domains for each node, you can change the row of cells in the node, and you can place labels and change fonts in cells. Even the format of a single node can even be set independently of the task type. There is also a great improvement in the automatic layout of the network diagram, there are 8 layout methods, and the layout effect is significantly improved by Project 98. Third, other functions in Microsoft Project 2000, you can now group tasks and resources. The grouping function can view the general-shaped summary of these packets based on the defined packet views. You can specify your own work breakdown structure (WBS) number format. In addition, Microsoft Project 2000 allows you to create multiple granular structures in custom domains, so that the task can be sorted and packet based on these outline structures. In addition to defining custom WBS code, you can now define custom outline code. Unlike the WBS code, custom outline code is completely defined by the user, not associated with the outline structure of the project. You can create multiple sets of code for tasks or resources. Using this feature user can create code according to the outline mask, for example, the company's cost code or work code. Tasks or resources can be easily filed, sorted, and packets based on the defined code. The cell editing in Microsoft Project 2000 is the same as Microsoft Excel, and now you can edit directly in a cell or edited in the Edit Bar. To use a cell editing, simply click on the cell you want to edit. Outline levels can be expanded more efficiently. You can now select the outline level of the display task. You can now set a high row of rows by dragging the lines between the tasks to the desired height. Microsoft Project now provides a function of using the fiscal year using the main time scale and the secondary time scale. Microsoft Project now supports months as a working unit. Type "3MON" in the construction period, it will be identified as three months. Like Microsoft Excel 2000, Microsoft Project 2000 supports multi-document display in the Microsoft Windows taskbar. Press the Alt Tab key to switch back and forth between the Microsoft Project file. Like other Office 2000 products, Microsoft Project 2000 now includes improved hyperlink features. You can now select a hyperlink from the previously viewed link list and you can customize the "Screen Tips" of the hyperlink. Multiple Gantt strips can be displayed for a single task line or the entire project. You can add the project level domain to the header, footer, or legend of the view or report. You can now create a project based on a template. Microsoft Projects contain multiple contents detailed templates for different types of items. Microsoft Project now includes an option that allows comparison benchmarks or medium-term plans in the project. Microsoft Project now has more Tool Tips. If the time scale is directed, the date under a particular time scale unit is displayed.
If you point to a cell, the column width is narrow, and its content is displayed in Tool Tips. Each of the working table views has a Tool Tip, which provides in-depth and detailed information from the "domain" reference information. Microsoft Project includes a new HTML-based help system that uses dynamic help topics, updated "project maps" and more reference information. To learn about the Project Map, click the Directory and Index command in the Help menu. Microsoft Project 2000 supports a list of values that make more convenient, more accurate data entered, and calculate user-defined formula functions for custom data and graphical tag features that represent custom domain data. You can now automatically save the project file every few minutes. You can customize the time interval, you can select only the active item or save all open project files, you can also choose to give a prompt before saving. You can now select a task by clicking the appropriate Gantt bar chart. This feature makes it easier to determine which task bar charts are made easier. Microsoft Project 2000 allows you to specify the default directory for saving files. You can specify different save directories for project files, user templates, and workgroup templates, or specify the default format when saving items. The fill point makes the upward fill or fill the operation more convenient, and now these functions are included in the "Gantt Chart" view. Fourth, the Working Group Function Online Working Group features in Microsoft Project 98, Microsoft Project adds Microsoft Project Central. Enhancements include personal "Gantt Map", screening, sorting, grouped, task delegation, reporting, and reporting capabilities, offline work, setting message rules, and many other features. Like Office 2000 applications, Microsoft Project uses Microsoft Installer technology. Only the files you want are installed in your system. If a key file is lost, the installer will reinstall the lost file. Microsoft Project 2000 allows installation of language packages to make the installed version of Microsoft Project to display menus and dialogs in another language. You can save your file as the file format of Microsoft Project 98 MPP. Using this format can be easily exchanged with a user exchange item that has not been upgraded to Microsoft PROJECT 2000. When saving for this format, Note that Microsoft Project 98 does not include all features in Microsoft Project 2000, so some information may be lost when saved as this format. However, by default, when you want to save as Project 98 file format, Microsoft Project 2000 will remind this. Microsoft Project 2000 can read system policies and disable a feature based on this policy. For example, an administrator applies a policy to secure the "Office Assistant" to "Justice Path". (In all "Office Assistants", the "jigsaw puzzle" has the least animation, which is the best choice for running performance optimization in the Windows Terminal Server environment.) Microsoft Project 2000 will keep this policy to allow administrators to control the user environment. Some new features, such as grouping, customizing WBS, custom outline code, have related methods, so you can make program editing and apply to your project.