Title: Write to Stone proposal _20041013Content: I believe that your experience is better than I, but I still mention some suggestions, I hope to help. This is some of my suggestions. 1. Project Plan a) Being a Project Plan must personally supervise and monitor, otherwise the project has deviation, and you can't correct it, you can only compromise. b) Develop planning to make all members in the project to reach a "consensus", and unify the target. Otherwise, deviations and compromises are prone to each group. 2, the level of knowledge of the group allocation employees is long and short, the character can also be divided into three equals: experienced, some experience but needs to be further improved, initial entry. For these cases, there must be an experienced experience in the group, and to increase the administrative rights of this person, it has the right to supervise and guidance. Of course, the group 2, less experience, and will conduct regular discussion and experience rich. Communicate, if you encounter a lot of bottlenecks, you must organize exchange immediately to avoid affecting other groups or even the entire project. If the group structure is unreasonable, it is difficult to adjust after the project is processed after a certain period of time. 3, progress monitoring and work returns a) Progress monitoring monitoring cannot be a single item monitoring person, and must be monitored step by step to ensure that perception can make each link. b) Work returns everyone's work must return to the task assignment in the designated time, regardless of the task to complete, how much resistance must be reported in time. If the task cannot be completed in time, it should be performed in time after the bottleneck, and return. 4, the coordination between the project (group) must have a special person to coordinate, the resources, demand and progress, this person should communicate with the team, and also communicate with the task assignment. It will be very tired if it is made to send people to this role. 5. Staged Summary Each unit test must be summarized, summarize project progress, design structure, code quality, experience exchange, otherwise the error begins, if not correct, step by step into an unpackored situation. 6. Strict white box tests For people with experience and experienced, the white box test is very big. It is not necessary to say that the white box test also wants to write the test plan to submit and review, otherwise, where is it, and finally A chaos. 7. The rigorous project document write document is also the finishing of his own ideas. It must be organized after the stage of completion, and it can also find some errors (need to record the wrong and problem documents and review, fix it according to the situation), The future process promotes role. P.s. Everyone will have lazy emotions. If you use Renhe's attitude or let them consciously, the project will inevitably mess. So the project is required to be black: strict implementation plan and supervise the project. STONE project experience:

1. The project starts working hours to be cautious, and the tasks should be fully communicated with the responsible persons, and they have confirmed, including development and test tasks.

It is necessary to fully understand the productivity of project members.

2. To set up a project milestone, track the milestone

3. To monitor progress / otherwise lose a child

4. If the project is large, it is more complicated, and the work is thousands. It is planned to do a high-level plan and detail plan, and the details are given to the group leaders to do planning, and they are responsible for the progress, that is, divided into master projects and more Top

5. The project manager must dominate the project objectives and do not allow our line to set up a high level or other unrealistic goals.

6. Unable to share the product's strategic planning to others (especially those who do not have product planning experience and ability), otherwise the project manager can only find ways from tactical level, sometimes it is often in vain, because the strategy is problematic.

7. There must be a full-time project manager

8. Implementation of the project plan, project system, and project processes