"E-government" in demand must never stay on a slogan, when specifically in an application, its implementation requires mature methodology and a perfect product solution. Some classic cases that have been recognized are actually painted with the "success track". Wipe your eyes, look at it, and you can talk about it again.

Beijing Local Taxation Bureau eliminates information islands

The old Beijing Local Tax Information System The crux is that various information resources are like a plate, forming an information on the network. Even a simple online electronic tax, a series of data updates that it produce can only be reflected inside the system, but unable to start related business processes in other application systems. In this regard, the approach of Beijing local tax can only be inefficient, repeatedly entry, and repetitive storage of data information, apparent that this is the original intention of violations. The Beijing Local Taxation Bureau hopes that the new system has extremely flexible, and each module is independent of each other. IBM provides an overall architecture and design of information construction for Beijing local tax. At the same time, the particularity of the tax industry also requires IBM design to eat the needs of users, and the entire plan must be practical and advanced. The Beijing Local Taxation Bureau puts forward the concept of "four online 1 library plus safety". From the function and structure, the entire system is set, ensuring future design, and develops can fully take into account the user's traditional usage habits. In order to ensure the quality of engineering quality and system operations, the Beijing Local Taxation Bureau took the lead in the industry to lead the advanced approach to project management and project supervision, and IBM again selected. Several roles of IBM should be shoulder, not only responsible for overall design plans, but also work for project management, supervision and project consulting, technical support and construction project management organizations. Track review: Through the implementation of this overall solution, the various information on the Beijing local tax will gradually disappear, and the information is fully shared and the data is unified storage management. Based on this, the organizational architecture and business processes of the tax department will have a deep change. For example, it is now levied, and it will be levied in accordance with the natural legal person. The reporter believes that in the process of the system selection process, I don't know if the Beijing local tax considered supervision is a clear third party concept. Perhaps it is not only the best choice to bear the implementation and supervision of the IBM.

"7 days certificate" origin Lotus

The complex workflow is almost too much from the manual operation. The implementation of the "Remote Approval Management Information System of Investment Project" has enabled the Guangzhou Huadu District Government to achieve the "7-day certificate". The district government's subordinate investment project management center has developed several specific objectives on the "Investment Project Remote Approval Management Information System". First, we must establish an office communication platform for 14 major bureaus and other 14 major bureaus, including flowers and foreign countries; secondly, it is necessary to realize the registration and remote approval of the project. On the basis of the above objectives, the system should also realize the enterprise to check the relevant information of government license through the Internet. These high requirements for similarity and processization are the length of the Lotus series. With the use of Lotus Domino / Notes Group technology, the management center has successfully implemented the "7 Day Certificate" in the office automation, and the achievement of breakthrough in optimizing office processes, improved quality of service, greatly improved the government. Office efficiency. Track Auditor: In this case, the efficient flow of the information flow greatly improves the original workflow. It turns out that the full set of workflows that need to be completed ten days and a half will now be greatly shortened. This not only improves the government's management and supervision capacity of the approval process of investment projects, but also to a large extent, the influence of bureaucratic and unregistered winds, and establish a good government image.

转载请注明原文地址:https://www.9cbs.com/read-117133.html

New Post(0)