2004-07-29 Workload statistics completed

zhaozj2021-02-16  93

2004-07-29 ----------------------------------------------- -------------------------------------------------- ---------------------------------------- 09:10 Sit down, sleep in the bus After a while, now the spirit is still. I am ready for a while to connect the network, this is the policy, but there is no way. The king talks about the problem of talking about the topic, saying is the 250 topic topic, now half of the book, so it is not considered in the next half. 09:15 Change the content of Chapter 5, mainly to add two words. In addition, it is necessary to change the third chapter tomorrow, and then send it to the fourth chapter and the fifth chapter. 09:30 changes. 09:56 Download a rename tool from the Internet to complete those files. 10:37 Example of the list of points is done. Now is an example of doing the upper and lower links. 11:32 Repeated tests, make the second example, but there is still a contradiction between the call and the intermediate of the URL. This example takes a near day. The experience can be summarized, and the efficiency can be more than double. 11: 42response.write " "in the first chapter" & "" What should I add some quotes? 11:57 After testing the creation of the directory index, the link between the first chapter and the last chapter does not need to be hidden, or do not get it. In addition, I thought about building a complete book library and tried it, and I didn't want to spend it. 13:45 I slept for more than an hour at noon, dreaming, often uneasy. This is starting to rain. Take a workload at 4 pm. 13:54 Seeing Content Linker can also be used to add a drop-down list jump feature. I want to try it, but I still want to count. JS37814: 17 new components know how to add, this is the most smooth. But still search online. 14: 47BrowserCapabilities components are added. But it's finished, I still know that I will not spell the name of this component tomorrow. The difference between actual and written books can be seen. 14:52 Ready to do the jump as a top-machine exercise, want to get it out first, or the time to come to find the time. 15:20 The exercise is completed, the process is still smooth, but it is the time when it is still time. In addition, what you said earlier is now able to write, such as how to do list, you have to find a format. 16:02 The workload statistics are completed. Added the first chapter of the exercise answer. July 2004, the workload statistics wrote the "ASP Practical Training Course" from July 5th to July 28. Chapter 1: 35 Chapter 2: 17 Page Third Chapter: 25 Page 4 Chapter: 20 Chapter 5: 17 Page VI: 20 Follow Comprehensive Example: 30 Page ---------- Total: 164 Page 16:03 Seeing the workload of others, it is basically Two hundred or more, copy, I am afraid of them. I have never written in the final integrated instance. This is the first month of Nanjing's official work, there is no normal run in the first half. This efficiency is not imagined in Beijing. But here, I have to finish this book next month. The latter content is also very hurtful, especially the debugging of the big example, while watching it.

转载请注明原文地址:https://www.9cbs.com/read-12005.html

New Post(0)