Writing of feasibility report

xiaoxiao2021-03-30  209

table of Contents

Market analysis 4

2. Policy Analysis 4

3. Competitive strength analysis 4

4. Technical Feasibility Analysis 4

5. Time and Resource Feasibility Analysis 5

6. Intellectual Property Analysis 5

Market analysis

prompt:

(1) Analyze the history and development trend of market development, indicating that this product is in the development stage of the market.

(2) Price analysis of this product and similar products

(3) Statistically the total amount of the current market, the share of competitors, and how much share can be analyzed.

(4) Product consumption group characteristics, consumption methods, and factors affecting market.

Note: The reference data should be stored in the data source, and it is best to have an intuitive chart.

2. Policy analysis

prompt:

(1) Analysis has no policy "support" or "restriction";

(2) Analyze "support" or "interference" without local governments (or other institutions).

3. Competitive strength analysis

prompt:

(1) Analyze the market situation of competitors;

(2) Analyze the strength of competitors in R & D, sales, funds, and brands;

(3) Analyze your own strength.

4. Technical feasibility analysis

Tip: From the technical perspective, "Do you have it?", "Do you do it?", "Is it fast?".

5. Time and resource feasibility analysis

prompt:

(1) Develop this product and invest in the market according to normal operation, is it still coming?

(2) Can the staff in the budget be in place?

(3) Can software hardware in the budget be in place?

6. Intellectual property analysis

prompt:

(1) Analysis has existed certain patents will hinder the development and promotion of this product;

(2) Analyze whether this product can be protected by intellectual property rights?

The most important thing is to do demand analysis.

Next to do feasibility analysis

It is important to analyze it.

UP

Please enter the company name document number product version of the company

Product Name: Total Page

Feasibility analysis report

(For internal use only)

Document author: ______________________ Date: ___ / ___ / ___

Development / Test Manager: ______________________ 日: ___ / ___ / ___

Product Hue: ______________________ Date: ___ / ___ / ___

Management Office: ______________________ Date: ___ / ___ / ___

Please enter the company name here

Copyright Not copy

Feasibility analysis report

Keywords: [Add keywords here]

Summary: This article analyzes the feasibility of the needs in the prior art in the technical needs of the user in electrical management, and proposes the corresponding solution. And analyze the feasibility of the project itself.

Abbreviation description:

1 Introduction

1 .1 Writing

This article is used to analyze the feasibility of the project, including project feasibility and the feasibility of negative in terms of funds, equipment, personnel, and user needs to ensure the smooth progress of future projects.

1 .2 background

slightly

1 .3 References

slightly

1. Terms and abbreviations

slightly

2 technical possibility

The quality of personnel

slightly

technical foundation

Project technical requirements:

The company has ten development technicians, including X-people, designers X-people, and developers X ten people, can form a full set of technical work for guidance, analysis, design and development; relatively, according to project Technical requirements are lower:

The interface programming requirement is, slightly; it can be seen that there is no technical content that has been developed.

Database programming requirements are:; existing technical strength can be solved.

Interface coding requirements are:; due to very simple requirements, there will be no problems in technology.

The agreement is:;; From the request, it can be seen that the demand is very clear, and is very willing to cooperate, so in clarifying the responsibility of both parties, and then determine the problem, the problem can be solved.

Software foundation

The user has no special requirements. The specific requirements are:.

3 device possibilities

funds

slightly

equipment

slightly

Resource

slightly

4 personality

Number of personnel

slightly

5 system workload

Target demand

slightly

Design demand

slightly

Design workload

Overall design workload:;

Front desk design workload: slightly;

Database design workload:;

Interface design workload:;

6 code workload

Module number of components

Interface workload:;

Database workload:;

Program workload:;

Algorithm research workload:;

Data workload

Interface workload:;

Database workload:;

Program workload:;

7 file requirements and time feasibility

Format standards and test requirements

slightly

Whether the time is feasible

Since the user's requirements are not very clear, after consultation with the user, the development time is set to XX days, because the middle must pass a holiday, the final completion time is set to XXX days.

8 can be manageable

Management project

slightly

Software management

slightly