Problem

1. Production Planning Department and Sales, it can be very convenient to see the corresponding inventory of each material in the order, without the need to look up

2.

In foreign trade sales, the warehouse inventory needs to be inventory according to the contract, ie the same inventory is inserted according to the contract. Free items have been used to manage foreign trade contract numbers, but this is handled to some of the products that are also domestic sales, which is not conducive to actual operation.

3

3. The receipt of the post is a workshop of the company, responsible for work in the workshop and finished products. There is a virtual shuttle bin in each workshop for semi-finished products and other inventory dedicated. At this time, the receipt of the maintenance of the row tube role, and the current definition of this role is difficult. The role of the original warehouse tube is defined as to control its warehouse permissions, and do not control its department permissions, and the role of the receipts of the post is defined as the control department, and the warehouse is not controlled.

4.

The workshop and the workshop are fostered in the workshop, it is not good to handle, if the returns are used to ship, the business receipts must open two sheets. At the same time, the warehouse is intermosed with the warehouse, there is also a number of questions, which is easy to forget.

5.

After the sale of the invoice is after the warehouse is sold, it will not need to be reviewed at this time, that is, after the sales invoice, the sales of the warehouse will change the number, which will lead to the documents. The numbers are inconsistent.

6.

The notice is notified by the actual outline number, and if the goods do not have lost goods, it will not delete the goods that have not been sent, so that the filling will not cause the notice and the actual export.

7.

After changing the system, the PMC department is not adapted or not familiar with the new production arrangement process.

8.

The verification of the workshop cannot be realized. The so-called verification is to judge the workshop of the workshop in the production of the workshop, thereby compare the temporary inventory of the workshop.

9.

UF's bloated client, making large part of 128MB memory computer could not run smoothly, there is a customable client because there are not many modules involved in the workshop or warehouse.

10.

The filtration in the extraction of the goods is simple, and only if it is almost completely entered into the inventory name, it may be more smooth to find

Go to the material, otherwise the positioning function after entering the material will not be positioned, and it is formally fed.

11.

"Filter Set" in the list that cannot be locked, causing an unexpected operation, and everyone goes wrong together. And it is artificially

After accident deletion, you can't recover.

12.

An abnormal online condition often occurs, causing system settings that cannot be performed.

13

The print module does not have the default association with the display module, often selects the display module, but forgets the case of the game formula caused by the print template.

14.

Personnel operation is very unskilled.