Software test engineer written test questions (1)
01. Why do you want to carry out software testing in a team? 02. Do you understand the software testing process of the company working in the past? If you know, please try to do something in this process? What different characters are made by different roles? 03. Do you know the software development process of the company working in the past? If you understand, do you have a complete development process to do what work? What different characters are made by different roles? (For software test parts, you can briefly) 04. What kind of work did you have to do in the past test? Which part of these is best at? 05. What are your familiar software test types? Please try to compare the differences and links of these different test types (such as functional testing, performance testing ...) 06. Please try to compare black box testing, white box testing, unit test, integrated test, system test, acceptance test Differences and links. 07. What is the purpose of the test plan? What is the content of the test plan work? Which is the most important? 08. What do you think is the key to doing a test plan? 09. What are the test case design methods that you are familiar with? Please explain these methods in specific examples in specific examples. 10. What do you think is the key to the design of test case design? 11. Please take advantage of your previous actual work as an example to describe a complete process of test case design. 12. Have you conducted the review of test cases in your past work? If so, describe the process and review of the test case review. 13. Has your past performance test work? If so, please describe the complete process of your past performance test work as much as possible. 14. Are you using some test tools when you work in performance test? If there is, please find out how the work of the tool is described in an example of how this tool is applied in actual work in an example of an example. 15. What is the purpose of doing performance testing? What is the key to performing performance testing? 16. In your previous work, a software defect (or bug) record contains what content? How to submit high quality software defects (BUG) records? 17. Did you use some tools to use some tools to manage software defects (BUG) management? If so, please describe the process of tracking management of the software defect (BUG). 18. Has you ever tested and integrated testing? If so, please talk about the actual development of these work. 19. How do you see the software process improvement? Do you have something to improve in a company you have worked? What is the work environment of your desired ideal tester? 20. Do you have a software configuration management? Can you describe the development of this work and your understanding of this work? 21. Are you familiar with some mainstream software engineering methods and ideas such as RUP, CMM, CMMI, XP, PSP, TSP.
If you are familiar, can you talk about these methods of understanding and ideas? 22. Do you think how to improve communication efficiency and improve communication in testers? What is the key to maintaining tester good interpersonal relationships with other members of the development team? 23. What is the thing that makes you feel unsatisfactory or unbearable in your past test? How did you treat these things? 24. Are you willing to talk about some of our work experience and experience in the past learning and work? (Can include software testing, process improvement, software development, or other aspects of this) software test engineer written test questions (2) 1. Judgment questions (1 point, 12 points, correct √, wrong ╳) 1. The purpose of software test is to find out the defects of software as possible. () 2. Beta test is one of the acceptance test. () 3. Acceptance tests are implemented by end users. () 4. Test staff before project projects do not need to submit any workpieces. () 5. Unit tests can find about 80% of software defects. () 6. The code review is to check whether the source code reaches the module design. () 7. I need to integrate the tester from the bottom up to write the driver. () 8. Load testing is to verify the ability to verify the system of the system to be tested. () 9. Test staff should adhere to principles and defects are not repaired. () 10. The code reviewer is generally served by the tester. () 11. We can make the software does not have configuration issues. () 12. The integrated test plan is submitted at the end of the demand analysis stage. () Second, no choice questions (2 points per question, 10 points) 1. Software Acceptance Test is qualified by the standard: () A. All the features defined in the software requirements Analysis Manual have all achieved, and all performance indicators meet the requirements. B. All test items have no residual primary, secondary and three-level errors. C. Establish an examination and approval form, demand analysis document, design document and code implementation agreement. D. Acceptance test workpiece is complete. 2. Who does the software test plan review do you need to participate? () A. Project Manager B. SQA person in charge C. Configuration person in charge D. Test group 3. The following is correct in the description of Alpha tests: () A. Alpha test requires user representative to participate in B. Alpha test does not require user representative to participate in C. Alpha test is a D. Alpha test is a 4 of the acceptance test. Test designer's duties are: () A. Formulate test plan B. Design test case C. Design test process, script D. Evaluation Test Activity 5. The entry criterion for software implementation activities is: () A. The demand workpiece has been baseline B. Detailed design workpieces have been baseline C. The architectural workpiece has been based on the baseline D. Project stage results have been baselined
Third, fill in the blanket (1 point per empty, 24 points)
1. Software acceptance tests include, three types. 2. The system test has 15 methods for function testing ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
3. Design System Test Plan requires a reference to project documents, and iterative plans.
4. The integrated strategy used for the process-oriented system is available, two.
5. The steps of writing test cases by drawing the cause of the fruit chart are, and convert the cause chart into a state diagram a total of five steps.
Fourth, brief answer (37 points in total)
1. The difference between the judgment and peer review. (4 points)
2 . What is a software test. (3 points)
3. Briefly describe the process of integrated testing. (5 points)
4. How to do a good document test? (4 points)
5. How many methods have you mentioned in white box test? (6 points)
6. Does the system test plan need peer review, why? (4 points)
7. The difference between Alpha test and beta test. (4 points)
8 . The difference between load testing, capacity testing and strength testing. (6 points)
9 . What is the standard for testing? (3 points)
Five, design questions (15 points a total)
For the program control diagram given below, the least test cases are written in a variety of test methods.
Software test engineer written question (3)
First, fill in the blanket: (2 points for each space, a total of 60 points)
1. The output workpiece of the software implementation activity has,,.
2. The code review is mainly working.
3. The duties of the interested members of the software implementation activities are.
4. Verification and confirmation software implementation activities mainly, code review,,, SQA verification.
5, indicating that the test is over.
6. The purpose of software test is.
7. Software test is mainly divided into four types of tests.
8. Software test activities have eight steps to develop test programs,,,,, test evaluation, and testing.
9. The output workpiece of software test activity is _,,,,.
10. Software test roles,,,,,,
Second, no choice questions: (3 points for each question, a total of 15 points)
1. The import guidelines for software implementation activities are ()
A, the demand workpiece has been baselined
B, detailed design workpieces have been baseline
C, the framework workpiece has been baselined
D, the project phase results have been baselined
2. The following roles are not integrated with the integration plan review ()
A, configuration manager
B, project manager
C, tester
D, coder
3, software test design activities mainly ()
A, workload analysis
B, determine and explain the test case
C, establish and structured testing process
D, review and evaluate test coverage
4, not to be integrated test steps ()
A, formulate integrated plan
B, execute integrated test
C, record integrated test results
D, regression test
5, the input workpiece belonging to the software test activity is ()
A, software work version
B, tapeable report
C, software demand workpiece
D, software project plan
Third, ask questions: (a total of 25 points)
1. Which level of the project centralized management is in software companies? (2 minutes)
2. Please describe the life cycle of the software test activity. (8 points)
3, what is a test assessment, what is the scope of test assessment? (5 points)
4. Explain the definition of the work version. (2 minutes)
5. Please draw a flow chart of software test activities. (8 points) Software test engineer written test questions (four)
First, judgment questions (2 points for each question, correct "√", wrong "╳")
1. The good tester is unremitting to be perfect. ()
2, the test program is only running in the expected manner. ()
3. There is no product that is very highly reliable without quality. ()
4. Software testers can test the product manual. ()
5, static white box tests can be found in missions and problems. ()
6, always design a white box test case. ()
7, you can release software products with configuration defects. ()
8, all software must perform some degree of compatibility testing. ()
9, all software has a user interface, so it is necessary to test. ()
10. The test group is responsible for software quality. ()
Second, the brief answer
1. How should the software's defect level be divided? (3 points)
2, if you can perform a perfect black box test, do you need a white box test? why? (5 points)
3. What qualities do you think of an excellent test engineer? (3 points)
4, when is the product test, even if it is? (2 minutes)
5. What is the purpose of the test plan? (2 minutes)
6, why do you want to perform software testing? What is the purpose of software testing? (5 points)
7. Software tests should be divided into several phases? Briefly describe the points in each stage of testing? The meaning of various stages? (5 points)
8, how to do a qualified tester? (3 points)
9. What kind of management measures take to defects? (5 points)
Third, professional words explanation (2 points for each question)
α test:
β test:
Drive module:
Pile module:
White box test:
Static test:
Fourth, the choice questions (2 points per question)
1. Which below is a dynamic analysis ()
A. Code coverage
B. Module function check
C. System pressure test
D. Program data flow analysis
2. Which below is a static analysis ()
A, code rule check
B, order structure analysis
C, sequencing complexity analysis
D, memory leak
V. Design questions (10 points)
In triangular calculations, triangular three sides: A, B and C. When the three sides are not possible to make an error when it constitute a triangle, it can constitute a triangle.
Calculate the triangle perimeter in sham. If the waist triangle prints "equal waist triangle", if the equilateral triangle, "equilateral triangle" is prompted. Draw out
Order flow chart, control flow chart, find a basic test path, and design a test case.
Sixth, discussion
1. Try to describe the whole process of testing a software project. (10 points)
2. Briefly describe your understanding of testing, some suggestions in future work. (6 points)
3, the difference between static test and dynamic testing? (5 points)
Software test engineer written questions (5)
1. What is software testing, and the meaning of software testing?
2. What is software test static analysis, software test dynamic analysis,
3. The following is a static analysis ()
A, coding rule check
B, program structure analysis
C, program complexity analysis
D, memory leak
4. The following are dynamic analysis ()
A, code coverage
B, module function check
C, system pressure test
D, program data flow analysis
5. From the perspective of test technology, the correct choice is (), give each meaning? A, static test
B, black box test
C, dynamic test
D, white box test
6. From the perspective of the test phase, the correct order is (), what is the selected correct policy meaning and what is the subject?
A, unit test
B, integrated test
C, system test
D, confirm the test
7. What kind of management measures take to defects?
8. In the test life cycle, the test process is divided into several phases, as well as the meaning of each stage?
9. Briefly write the meaning of introducing test management in the basic quality of understanding
10. In triangular calculations, triangular three sides: A, B and C. When it is impossible to form a triangle, it is impossible to form a triangle.
The triangle perimeter can be calculated when a triangle can be constituted. If the waist triangle prints "equal waist triangle", if it is equilated triangle, prompt "
Side triangle ". Draw a procedure flow chart, control flow chart, calculation ring complexity V (g), find the basic test path.