Small scale pilot summary report
1. What is the main job that is completed in a small-scale pilot?
l Responsible for the overall work of Pei County Store:
(1) Pilot work plan arrangement and work report on Pei County State Reservoir;
(2) Training of the system of grain staff;
(3) The system use counseling of grain staff;
(4) Candification of business data in grain depot;
(5) Communication with Xuzhou direct library: plan, statistical related data;
(6) The same wave of interface: the entry and enterprises notice and the planned issuance;
(7) Post data exchange, data backup, system upgrade;
(8) Modify the business system bug;
(9) Quality BUG finishing.
l Responsible for the re-reservoir test of Xuzhou direct library:
(1) Training work in the supervision of the relevant personnel of Xuzhou Library;
(2) Test of Xuzhou Database Reservoir Regulatory System: Includes BUG's finishing.
2, through a small-scale pilot, what do you think is the main result?
Successfully completed the test task of Pei County direct management library, and finally got the basic agreement of the leadership of the head office. The main work performance is as follows:
(1) Complete the arrangements and work reports of the pilot work of Pei County Library;
(2) Complete training on the library testers, very good guidance in the library to conduct testing;
(3) Complete the collection and timely organization of BUG during the test;
(4) Complete collection of main business data of grain departments;
(5) Completion of successful uploading of the post-business data;
(6) Very good communication, completion of the issuance of planned data and uploading data exchange.
3. From the perspective of implementation, what are the shortcomings, direct tubes and re-regulatory business systems?
Here is a general problem that is generally present, and the BUG is easy to explain well.
The place where the direct tube system needs to be perfect is:
(1) Tripage problem Consideration: Many places are very detailed issues, but it impacts the use of users, such as the list of lists, returns the button in the integrated query (you need to click several times to return);
(2) The whole system is inconsistent: some lists are sorted, some don't have, some default query all records, some of which are empty;
(3) Report files: including statistical reports of statistics and warehousing or reported reports, there is a system of cells that are blocked, the list is not allowed, the report does not show the date (separate Look at the report at all, I don't know which month);
(4) Ease of use of data exchange issues: If data exchange is completely transparent to the user, then once problems, how to solve it? How to have a good mechanism to guarantee; (5) Incompleteness of test: If possible, the developer should make a white box test, check the correctness of the integrity of the data in the database.
Recovery supervision system:
(1) Access speed: Access data is very slow, waiting for a long time. Whether it is from design implementation, the server's ability and network, it is worth considering; (but in Beijing, there is more than 10 times more than Xuzhou).
(2) Friendlyness of the interface: When the page is waiting to open, the interface should be displayed on the interface to give the user a hint: the system is reading data. If you don't get a response for a long time, you should immediately prompt users: network busy, request failed;
(3) The clearness of the page display: When the specific page is displayed, it is not displayed that the library is displayed; the list page does not show how many records are displayed, and how many strips are displayed without pages. It should give a feeling of such a feeling: When you look at the results of the query, you know which records are this record, how many bars, how many bars per page, a few pages, or which library of this library.
4, what else needs to improve?
Individuals still have a lot of places to improve:
(1) Exchange with customers also needs to strengthen: I can't hold some of the scales communicating with customers;
(2) Reasonable arrangement of task: Some tasks The completion of the task affects the work behind, such should be arranged, otherwise, once problems, work may stop, reflecting the issuance of this plan;
(3) Time to take advantage of: Did not be good at utilization, leading to reporting work is always dragging;
(4) The greatest enthusiasm for work: For business, some of the business tests are only functional, and there is no test for saving time. If there is currently no function, it is likely to use it.
(5) Usually, you should increase your own learning of related knowledge: the basic operations related to Linux, DB2, etc. should be strengthened in the usual work.
5. What issues do you think should pay attention to during the future implementation?
The problem should be noted:
(1) Simulation drill of the real environment: such as data exchange failed, how to handle it, users cannot manually modify the database;
(2) A full preparation: including hardware, software preparation, because there may be a variety of problems during the actual process;
(3) Effective guidance of customers: The previous business in the Curri may be different from the system, and the customer needs to be effective guidance;
(4) Full preparation of various information: Whether it is a flow chart of user manuals and systems, it is necessary to prepare care;
(5) Countermeasures for various emergencies: can't wait for the issue, temporarily resolve, and have a preparation program in advance. 6. Please talk about the feelings of small-scale pilots.
It is undoubtedly the desire for each developer to participate in all the phases of a project. Through this pilot, whether it is technically, or from people to communicate, and independent the ability to solve problems, you have got a good exercise.
(1) The ability to work independently: In the case of no leadership, arrange your own work according to the actual situation, adjust the relevant work according to the changes in the actual work, and many things have to resolve and bear their own independence;
(2) The ability to communicate with people: Many things have to take care of themselves to communicate with relevant personnel of the goods, and take the initiative to guide testers. This requires a certain way and attitude. Because you can get good information from your customers anytime. At the same time, you have to maintain a good relationship with our customers, you need to deal with it. At the same time, the negotiations of the wave of Xuzhou Kufang need to pay attention to the way, so that the two can work together;
(3) Business Level: From contact with specific business, you can further understand the real use of the system, you can know how to improve the system next step. At the same time, you also change yourself from the user's perspective, not just technical problems;
(4) Improvement of technical capabilities: Independently operate the relevant system of this deployment, from the SUSE Linux system, the use of the related tools (PuTTY, VNC Viewer, Winscp3), to DB2 data backup and recovery, and the startup and shutdown of WAS . Including the discovery and solving of data exchange issues, very good exercise.
But at the same time, some shortcomings are also found, some need to improve. In the future, I will pay special attention to these issues, and I will continue to improve myself.
From the perspective of the project, it is also a chance of our developers to understand the needs and further improve the system. In the pilot process, the irreplaceability of real data is a good test for the system. It is recommended to use real data to test as early as possible in future project development. In testing problems, you can't avoid it, you should find problems as much as possible, and consolidate the foundation for future promotion.