"Sculpture" System Construction Plan "
- "Double Pyramid" model for "sculpture" system development process
Yuan Dejun (last updated: June 21, 2004)
(Read more before reading this article, please confirm at least "" Sculpture "System - Open Software Project Collaboration Platform")
table of Contents:
Foreword: system indicator and dual pyramid
First, the scale of the "sculpture" system is expanded, and the system credibility is improved.
Quantitative indicator, technology depth and technology, project complexity, commercialization, credit
Second, the equilibrium and orderly cooperative development atmosphere is the constant pursuit of the system
Third, all work is for "development"
1. Get more people's identity, jointly promote the construction of the system
2, the definition of the system starting point
3, the definition of the first team
4, member of the first working group
5, "Working Group" internal forum and information release system
6. The extensive social work is to ensure the social credibility of the starting point, and the basic material needs.
7, system starting point release, and extensive propaganda
Fourth, the current work summary and the following work details
1, "Wen Wen"
2. Quickly form "Workgroup" internal communication platform
3. Strengthen the "Working Group" work, accurately designed for system starting point
4, system starting point construction, accumulating social credibility and supplies
5, system release, system operation and self-update
V. Resource demand analysis at various stages of system construction
1. "Working Group" was established
2, the system starting point is established
3, the operation after the system starts
Preface:
The accumulation of the "sculpture" system is the accumulation of the evaluation index of all participants under the "Sculpture" system platform. The "Sculpture" system starts to start the development of these indicators. They are specific: participants (developing individuals, development groups), technical level, credit level, etc .; the number, technical difficulty, scale complexity, commercial proportion of the system, wide range of applications The indicators are accumulated: the credibility of the high-efficiency collaborative development platform on the basis of credit;
The dual pyramid is discussed from 2 different perspectives to the development of the "sculpture" system. The first pyramid is considered from the system development scale and credibility, and the improvement of various indicators within the system will directly act on the improvement of system credibility, and accumulate the core. The second pyramid is the various development and application directions of the system advocacy collaborative development mode to arrange in each of the different levels of wells in the pyramid.
First, the scale of the "sculpture" system is expanded, and the system credibility is improved.
The operation within the system is the development of a project in various participants. The number indicators in each indicator are the simplest and can visually reflect the size of the system. Other indicators are obtained based on the quantity analysis statistics. As the core of the system, the number of participants is the fundamental of determining the system carrying capacity, only more participants can join us to make more development and project operations. Therefore, obtaining more developers and development team support is the first emphasis on development, and the development team is a true carrier of collaborative development, and should focus on development.
Technical depth and technical breadth are indexes of 2 different aspects. In collaborative development environments, individuals to participate in the participants should be highly advised, and the technical breadth of the system can reflect the balance of system development over the system. The technical depth refers to the development of the specific position of each development link to the research and master of this post technology, and for the project organization and coordination personnel should be the research on the project organization, not focus on how the details are achieved. . Therefore, the system will first develop universality in the fields of application development, and then focus on depth research in various fields.
Project complexity is an important indicator for measuring system synergy development capabilities. Only people in various development areas are abundant, or have special talents with R & D capabilities, they can make any projects that have complexity to achieve, and any demand is met. It is also the goal of the development of the "sculpture" system. Therefore, more items and programs with "weight" in the initial period of the system are more necessary, and the participants will make the direction of more clear efforts. With the development scale of the system, the implementation of the necessary conditions, a goal is achieved, and it must be a hundred times more confidence to all participants. Commercialization ratio: It is part of the "material" income in the "sculpture" system. It is not just a simple to meet the benefits of individual needs, and it is also an important indicator of the current value of individual value. Therefore, the commercial proportion of projects in the "sculpture" system will act directly on the enthusiasm of participants. If pure academic studies must fail to grow, only idealists are working hard to achieve ideals. Therefore, from the initial stage of system development, more commercial development projects, and support for more business agencies are the maintenance of system development.
Credits, existing in the "sculpture" system. Each thing to do in the system is not closely linked to credit. Participants' credit directly affect the efficiency of collaboration, bad credit and unknown communication. The "Sculpture" system is the reasonable fairness and improvement of the implementation agency and system, and the basis of the credit of the system itself. Without this basis, the system will not survive one day. Only in the improvement of various key indicators, and other elements of other relevant system credits can be firmly confident, the confidence of the old participants can attract more participants to expand the team, and achieve a benign circulation. The establishment of the mechanism, the "credit" of the system itself is the problem that the system is most considerate, and it is also an issue where the system development has continued to deepen and improve. It is also the core performance of "sculpture" system credibility.
Second, the equilibrium and orderly cooperative development atmosphere is the constant pursuit of the system
The entire software industry is like other industries, with its own value chain, and the development of the pyramid shape. The developer of the core technology will support the development of the entire industry, the application and development of different levels, together with core technologies, constitute the pyramid shape of the entire industry. The weakness of any level can not carry the development of the upper application, the bottleneck problem is a stubborn in any industry, and must be resolved primarily to healthily. On the basis of balanced development, the research and development of core technology is the driving force for the development of the entire industry. However, only the research and development of core technologies and ignoring the promotion and research of upper applications, then the core technology has no soil, consequences are the enthusiasm of the final loss of core R & D. Balanced Order, collaborative development is the "sculpture" system constantly pursued pyramid shape with perfect geometric ratio.
Third, all work is for "development"
1. Get more people's identity, jointly promote the construction of the system: When there is no brick tile in the system, it is not only a few articles in a few articles. If it is just an empty thing. Tong friends said that there are more common ideal friends, get more people's support, is the fundamental of system construction. As with anything, it is impossible to rely on a person's power, even if it is a superman, not to mention the platform and environment of all people involved, without everyone's recognition is impossible.
The goal of this stage is: extensively smashed a team of insight, forming a team with strong combat power, as the first batch of power for system operation, responsible for the system's operation, so that the system is showing, it is quite high. starting point.
2, the definition of the system starting: the standard of the starting point is to focus more group participants with independent organization; have a perfect organizational goal, clearly expressing views, and has a careful development strategy and organization Safe. This is not a concept with the internal communication platform of the first team. 3. The definition of the first team: I am equivalent to the first boundary of the "Committee" described in the "Sculpture" system. Members should be in order to meet the system starting point requirements, requiring specific implementation and operation of the staff (all the capabilities required to build the start of the construction system); there is also a "credibility" reputation member with the system starting point, they can bring system development First shovel soil (project, funds, participants, etc.);
4. Members of the First Working Group: To form the first world "Committee" as the work goal. Personnel composition:
Information Release Platform (Website) Design and Development Responsible: Complete the construction of the basic information publishing function of the "Sculpture" system, and system design work required by the system starting point, and work after the start of the organization. Secretary of the Committee: Responsible for the drafting of the "Committee" working procedures and management systems, and responsible for daily administrative work. Before the first world "committee", the responsible committee established and public relations work.
5. "Working Group" Internal Forum and Information Release System:
Before the first world "Committee", open the website, provide information on the "Sculpture" system to publish its design ideas, play a call, and meet the purpose of people of insight. At the same time, develop the Working Group work forum, with basic "you say me" function. While adversely solicit opinions, the documents needed to complete the system. Especially for the system starting point, accurate positioning and argument, and has been widely supported, and the development force required to develop the starting point development. Lay the basic conditions for the formal release of the system.
6. The extensive social work is to ensure the social credibility of the starting point, and the basic material needs.
Before the system is officially released, there should be a batch of projects to do in the system, and have certain universality and frontier, taking into account academic research and commercial applications, and project participants should meet universality to reflect system participants. Brass, and the wideness and depth of technology applications. The choice of system sponsorship is based on the main as possible, such as media, industry associations, governments, educational institutions, and private development organizations, and considering having a wide audience. There can be relatively high feedback in the system promotion period. And appeal. The choice of business groups is mainly measured by the wide range of business faces, while considering the balance between business groups in the system to avoid the development of the system due to position problems.
7, system starting point release, and extensive propaganda
After the basic system is established, it is possible to provide extensive propaganda through the media and extensive social forces to seek a rich support for participants in the development environment for collaboration, through the media and extensive social forces, with more system participants in close one step. On this basis, the ability to self-update in good system, constantly improve and develop the system. In particular, pay attention to the improvement of system operations, and the development of various indicators of various indicators of the maintenance system is carried out as the central task.
Fourth, the current work summary and the following work details
Results:
1. Complete the preparation of basic ideas, write with articles, prepare for expressing ideas to make friends
2, the framework of the NGNC open project, and the determination of its development outline, becoming an experimental project running on the system platform
3, get friends' identity, and help;
Follow-up:
1. Introduction to the NGNC and lead to the "sculpture" system, and play the "Wenyou". Propositions with posting and websites as the main means, and have targetedly selecting a 2-class population, which may become a "sculpture" system backbone, and a population of NGNC itself and its application. For example: Senior people with collaborative development ideas, have a good absorption of new things. 2. Quickly form the "Working Group" internal exchanges and information release platforms need to support more accelerated system construction. The technical director can become a talent in the future system building. Detailed implementation of the management of the human and material force required. Information release, to publish phased and experimental articles, elaborate system ideas, and continue to deepen the goals of "Wenxin".
> Pure HTML page, publishing a predecessor of a residentic "sculpture" system related articles.
> The internal working group forum supported by the friend, only discusses the workgroup to form and answer friends to the "sculpture" system, and the purpose of the comprehensive recommendations. When "You said me" forum capacity is not realized, use the normal forum function maintenance, to be newly functional, replace it.
> Other Project Title Title: "Sculpture" System Construction, "You speak I" Forum System, "Riddle" System Technology Realization, "NGNC" technology implementation and application.
> Open up blog to make a one-way elaboration, targeting the "Sculpture" system and "NGNC".
> Interview As a way of publishing information, the "NGNC" and "Sculpture" systems are introduced by readers.
> Track the "Sculpture" system construction process, including the preparation of the working group, etc., from the beginning, the open transparent operation mode is formed, which is the accumulation of "credibility".
3. Constantly strengthen the "Working Group" work, and achieve the starting point of the "sculpture" system soon. Under the continuous addition of the supporters of the new system, the system design standards are carved, and the humanity and material effort required to establish and prepare the "starting system".
"You do this" forum system tendering work: funded by sponsoring agencies, and has obtained territorial property rights; or developers independently developed by developers; development results are all sponsored by the owner's "sculpture" system. Use the right to use by the system. The development or related development of the "sculpture" system itself adopts the model of "you speak me" forum system tender. Intellectual property rights of the entire system have all owners (sponsors or developers or both), the right to use the system inheritance, transportation, etc., is determined by the "Committee" and is supervised by the public.
4, after the system starting point target is accurately designed, the organization of social credibility will start, with the process of system construction, social credibility is constantly deepening and perfect, and also accumulate supplies and needs, and obtain necessary sponsors.
5, the system is released, enters extensive publicity, with media publicity as the starting point, plus extensive social activities, publicity system ideas, and enter the system self-update cycle.
V. Resource demand analysis at various stages:
1. Establishment of the "Working Group": Support and introduction of media friends to get the opportunity to get a member of the workgroup and obtain other relevant institutions and organizations. Working Group Internal AC System (HTML Forum) requires a volunteer (if there is sponsored payment payable), work members use the like-minded friend team to utilize spare time free work (limited to policies and social activities), system argumentation Development is done in accordance with the system-related project operation (spontaneous or sponsorship). (The following assessment requires adding time requirements)
basic needs:
System website space production maintenance volunteers 1 friend forum / blog
Working Group Secretary Working Group member (continuous expansion)
Additional requirements: "You don't speak me" Forum Developer: From the current popular forum developers increased on its original basis, or to develop a new forum with a certain starting point under its own support; 2. Establishment of system starting point: Under the efforts of the Working Group, the system starting point is accurately designed, and is preparing sufficient manpower and material, and accumulates considerable starting social credibility. Resource demand is subject to the results of the Working Group; (The following is an assessment, requiring time demand)
Basic demand: System development and maintenance personnel: Constantly improve the research and development of various tools and technologies required by the Project Collaboration (requires sponsorship development) Administrative staff: Maintenance system to do everyday management, such as "committee" support , System is perfect, social activities; (by sponsorship support administrative overhead) Additional needs: system participants, members, members of the "Committee", and the wide range of social resources.
3, system operation: With the support of the "Committee" resources and ability, with a wide range of media publicity as the main means, and with a range of social activities, such as lectures, forums, speeches, development competitions, etc. ; (The following is assessed, requiring time requirements)
basic needs:
System development and maintenance personnel administrative personnel (part of the system)
The basic cost of media publicity and activities. (According to the activities, it is carried out in sponsorship) Additional demand: other social resources available within system resources.