"Sculpture" System, Open Software Project Collaboration Platform "
Yuan Dejun (last updated date: June 10, 2004)
table of Contents:
1. The process of software development, "sculpture" process;
2, the order system introduction, the operation of the "sculpture" system;
Definition of "order"
Participant analysis, system operation process
System operation under dynamic feedback
3, system participant gain analysis;
Core power of "sculpture" system operation - revenue
Three income noun explanation
Revenue flow analysis
4, the accumulation of the system "wealth";
Project evaluation system
Individual evaluation system
Measure the evaluation system with an indicator system
"Test" specification, other fruitful accumulation
"Order" specification
5, rules and technology, system "wealth" accumulation;
Development mode of project research and development
All-round information collection and statistics
Multi-platform, meet the technical solutions for any project management needs
Corporate member system
System of the Supreme Manager - "Management Committee"
6. The first work of the "Sculpture" system, the system itself;
First, the process of software development, "sculpture" process;
This article does not want to add a new name for this world. "Sculpture" is just a personal experience in software development for many years. From the beginning of the "Hello, World!" Starting, I think each programmer has a fascination of the beautiful world that will belong to himself. Just as everyone who loves sculptures, I hope that my dreams become a beautiful art, even if every piece of code, every code is pouring each programmer's heart. Not everyone who engages in sculptures can become art masters, just like thousands of programmers, it is also known as master, but as in the pursuit of art, we all put this beautiful world. Work hard to achieve your dreams.
Whether it is an artist, a student of ordinary art institutions, even an artistic enthusiast, from starting their own work to finish, always experienced such a process. A touch, a scene, an expression, evoke a inspiration, a creative impulse, perhaps a excitement of all night, or for a long time, a blueprint that may become a masterpiece is present in the mind of each creator In the middle, they started using years of experience, or just just learned from the book, starting to make the material, then hook out the contour, then draw the details, until a beautiful, or rough The born work is born. Perhaps, it is experienced, perhaps the calendar mistake, maybe the movement and passion have changed, whether the master is still an initiator, the blank or jade or stone may become a bunch of useless waste, or Recommunicate, or give up this touch, re-fall into new thinking.
The "software development process is a sculpture process" "Software development process is the era of various theories and ideas, too much about software development and project management, and there are too many ways to exist. In a variety of projects. I only describe a software development process and sculpture process in the state of maintaining the state.
The project demand is creativity, and the detailed design may become a tap. According to the class code, it turns a shackle, and the repeated test has become a fine crafted. The difference is that artists may be inadvertent "mistakes", but they have become the "casual" given by God. And a rigorous and planned project, but it is not possible to be a little bit, even if it is a bit drop.
Gradually, our project became a piece of precision watch. Each of our original vibrant people became a gear of this watch, and did one of their modules, a piece of code, became a "team" spirit. The core, melting yourself in the "team" a primary character. With the "completion of the design", the gear wear of our flesh is too fast, and the precision watch can only look for more durable iron to replace, or like the Japanese inventive electronic watch. Simply abandon gears. "Sculpture" system is a human development platform. Participants only need to play their own imagination, creativity, to achieve their dreams, there is no thing that can hinder dreams. This system is more accurately a transparent and open environment, consisting of equal open-disciplined environments with people-oriented rules.
Second, the order system introduces, the "sculpture" system is operated;
(1) Definition of "order":
A order is used as a standard unit that flows within the system to act as a carrier of system information flow. Here is the standard information type included in the "order":
Author: Order a copy done by a responsible person. The degree of settlement and information is rich in the ability to determine this responsible person, a single order of the same responsible person hooks.
Overview: Summary text of the order content, including the keyword for retrieving, to facilitate an inspection in the project process.
Text: order content. Detailed and accurately describe the task of order requirements: the function of the product; the block diagram of the module; the algorithm idea of achieving specific technical points; the product's functional appearance needs to convey product personality and philosophy; product operation processes, easy to use indicators Waiting; any need to support your own needs must be described in detail; and do our best to make the ability to excerfene, repeatedly describe the text content, avoid blurring concepts, and use ambigurative word.
Update Submission Time: As the core of the system, any modification of the order is a very important information in the project collaboration. The "Sculpture" system will use technical means to record any changes in each order, each order "ideology "The trajectory is the most valuable wealth. This information will be added automatically by the system and cannot be fill in manually;
Assistance Plan: Each order requires the support of others to be realized. Therefore, the order is more desirable to write the expectations of the aid in addition to defining their needs. The contents of the plan include: the ability of the aid, solves the time limit requirements of the order, pay the pay provider. Each order must have two different plans to ensure that participants in each system have a chance to participate in a variety of different projects. (The ability to assess system participants will be specifically discussed specifically)
(2) Participant analysis, and system operation process:
Participants of the "Sculpture" system can be anyone. A senior project manager, the postgraduate after school, a tender person who hopes to have some special function products, a national key project. They can meet their wishes here. The role positioning of each participant is analyzed only from the perspective of the operation of each item.
Project Overview, Description, Demand Analysis, System Design, Detailed Design, Code Realization, Testing Feedback, Acceptance Trial, Project Transfer, Training, etc. In such a multi-stage, the noun also exists in the "sculpture" system, just changed a different angle. Bundry. The "Sculpture" system does not accurately require the process of the project, the above project stage can be one or even one, or even one, as long as the responsible person in each stage has enough ability to drive. There is only 2 roles in the "Sculpture" system, order responsible, and order aid. Each system participant can act as a different stage, different order responsible person or aid, even you can take your own aid (if you are isolated, or you have enough ability And energetic superman), although this can compress the project process to simplify the management process, but the system does not encourage this, collaboration is the development atmosphere of system respected. Every participant who is willing to work in the system, you can fully play your ability to do your best, you can constantly challenge yourself, enrich yourself, and do your own roles. The system will contact each participant with "order" as the core, let each participant know what you are doing clearly, and understand what you can do, you want to do it. Investing career. All the premise is that you have to treat your role in a "sculpture". Write the contents of "order" enough detail, accurate enough, and fully clearly express the assistance you want. When giving assistance with others, it must be able to complete the "trust" of others to complete the "trust". Each role in the project operation is not possible to be born. The system will establish an atmosphere and rules, allowing the growth of each role, making mistakes themselves are very valuable wealth. For each role, because he gains a good experience. The discussion of the system participants' capacity assessment is an important technical means to establish this atmosphere. (3) System operation under dynamic feedback:
"Test" is everywhere, it is the foundation of the evaluation system of the "Sculpture" system, which is the feedback sensor. Each order must have a "test" access order, which is an important system that guarantees the smooth system information. Each order is generated while the same responsible person must organize his own ideas and give the accurate "test" requirements. The same "carved" future you need to accept the results, affirm or denies, and evaluate the standard of work. Test orders may have some contents to be synonymous, but absolutely impossible, because the angle is completely different. First, the "test" concept here has been derived from other content, refers to the standards and methods of measuring the quality of the aid results of supporters.
The testers for testing orders are based on the description of the test order, prepare a detailed acceptance program, prepare the test data, etc., or the human, procedure, or use technical means, in the future, mainly completed, even the self-commissioning phase during the main order execution process. , Give the test test. A special "test" support expert is required to meet such a large number of work.
The main order and test order will differ from the order of orders in the order of order. However, it is ended with the end of support, and the work of acceptance and evaluation is completed.
(4) Summary:
The "sculpture" system is based on "order" as the core, consists of "order" responsible person and "order" assistant, and the project development collaboration platform "test" feedback connection.
Third, participant gain analysis:
(1) Core power of "sculpture" system operation - revenue
The "sculpture" system running lubricant is the rule flow described above, and the real motivation is the income of the participant. It is directly elaborated here to show you the concept of "sculpture" system, and the transparent open collaborative development environment is transparent to related participants in the system. Any project's origin is powerful, "sculpture" system has made a summary of material income, future material income, individual evaluation revenue. (2) Noun explanation of three income:
Material benefits: Money (currency) is the current standard measuring exchange unit, which can be project development funds, or contract amount with the signature of the project manner, perhaps other forms of payment methods. In summary, it is known as the instant revenue measurement of currency.
Future material benefits: It is also a matter of money that can be measured, but there is an uncertain matter income for income. For example: a spontaneous project, without any financial support, if the initiator is for the purpose of obtaining material income in the future, it can use future material income as payment, promotion project progress, and a little "option" taste.
Individual evaluation benefits: In order to obtain other people's recognition, all participants need their own evaluation, such as level, credibility, collaborative spirit, etc., any intelligence, character, integrity, congenital, all day beforewards can give The information about individuals with others is very valuable. This value is bidirectional, one after another, you can get more people's recognition through your own practice and effort. A person who needs help can get a trustworthy support. This is the fundamental condition for fast and high quality completion in the system.
(3) Revenue flow analysis:
The "Sculpture" system simply concurrently the above three lengthy nouns: material benefits, future income, evaluation income. The items in any system are from the initiation to the end, and the flow of the revenue is from beginning to end.
First, the project initiator acts as the first order of the item, must determine the overall revenue within the project. After that, the execution of each order and the production of secondary orders will be the allocation of the revenue until the project ends. The overall earnings of a project can include all three benefits, or only one of them, this is the key factor determined by the project initiator and affecting the implementation of the project. Each plan in the fixed-order support plan must include a revenue payment portion. Here are a few examples of the composition of the overall income.
A, a budget project bidding. As a project sponsor, the bidder produced a bidding specification and specification requirements for bidding orders, descriptors and marketers. At this time, the aid will have multiple and become a bidder. At the end of the tender, the project consider will take out "material income" as a aid payment with its own profit scheme, describing the order. The receipt can promise the future payment method if the need for capital turnover is, but it also belongs to "material income". The "Sculpture" system will determine the system's project evaluation system, determine the scale, level and other attributes, and corresponding to the "evaluation" income that the individual participating in the project can be completed after completing the project.
b, a small company that is insufficient: I need to develop a project, but I can't meet the shortage of project development funds. Either through credit guarantees, borrow money to complete the project development with "material income", or to seek the force to participate in the development of the project with the "future" income mode (simple class ratio, which can be a technical participation). "Evaluation Revenue" still exists. Because the initiator uses the "future" income, its future depends ability and dealing with effect, etc., will affect the "evaluation income" of the initiator, that is, the initiator also pays "evaluation income" as part of the total benefit. But for a reputable enterprise or individual, the use of "future" benefits is a good means. C. A good creative planning: With the novel attraction of Idea, there is no material income payment, some are just passion, if the future business value is also expected, fully use "future" benefits evaluation income can achieve his dream.
D, an initiator without any experience: No background, the project involved in any substance or future income, can accumulate the evaluation earnings, which provides good soil and space for any kind and purpose project.
Fourth, the accumulation of system "wealth":
"Sculpture" system is nothing else, it is the rule of the system. Under this transparent disclosure, the most important accumulation is that the individual's credit evaluation, of course, the impartiality of the system is the accumulation of system credit. Credit-based development platform can greatly reduce the communication cost of project development, improve project collaboration capabilities, and upgrading of project complexity driving will enable more impossible tasks. With the increase in the project, it avoids unnecessary duplication development, avoiding vicious competition, which will be the wealth of all participants. Here are a few detail.
(1) Project evaluation system:
The hierarchy of each project is an important source indicator for identifying an individual participant evaluation system because all the behaviors in the process of participating in the project will be evaluated according to the project evaluation results. The authority and accuracy of the project evaluation will be available in detail by tracking the project document. It also provides a full material for adjusting the project evaluation system.
(2) Individual evaluation system:
Abstract evaluation of abstraction, experience, etc. is the starting point of credit communication, and the individual evaluation system will be provided to credit needs to credit needs with complete individual behavior records, but also to adjust the necessary information to adjust the individual evaluation system. such as:
The project sponsor, the company's representative, when doing the order of the task needs, it can reflect the task expression ability of the company's related responsible persons and the level of familiarity on the market, and the end of the project's payment ability and timeliness is also very important credit. index. Project organizations and managers, in the project sub-package, sub-order, system design, etc. provide reference for future assistance, one capability, organizers who have good communication and coordination, can make the participants of the project easy and free Implement their own tasks.
Any order of the aid, each order implementation, whether it is failure or success, will receive experience in development, can accumulate the unit time of development (the system takes an individual's time to develop projects at an angle), for development Success and development failed, or development cycle extension, development cycle, etc., the parameters related to time, the main parameters of the system individual of the aid identity, are assisted and corrected. The system-defined operation refers to the legal working day for 8 hours, a week for more than 40 hours a week. Participant's individual will use this measurement unit (hourly) when the individual is formulated.
For individuals who have just established a personal evaluation file, in order to rapidly improve the level of individual evaluation, two strategies can be used, one is more participating in the project, more orders, pay attention to the number. The second is based on its own needs, allowing "overdraft" to improve the quality factors in the level of individual evaluation levels. From a long-term development, the latter is not advocated, as this will distort the individual evaluation, which will only be borne by the individual in the system. In the former, you can use the information extraction of the system, give the objective individual evaluation with the front side, such as the words of diligence. In the order support, the act of active abandonment of the accepted task will have an impact on project development, and the degree is determined by the level of the project and order. At this time, individual credibility will be affected.
During the entire project collaboration, both parties of each order will have a mutual understanding in the event, and their evaluation has an impact on the later people. According to the results of the project evaluation, the order will also generate evaluation results, and the evaluation of the parties will be affected by the order evaluation results.
(3) Measure the evaluation system with an indicator system:
Whether it is project evaluation or individual evaluation, the purpose is to accurately measure the level of the target, quality and other attributes. The metrics of public trust authority can simplify credit exchange, further improve credit exchange efficiency, saving project development costs, and costing throughout the system. The indicator is determined, like any indicator of the world, it can only be measured relatively accurately, but will never be 100% accurate. The "Sculpture" system will establish a dynamic indicator correction system that provides an objective and trustworthy standard for the measurement of the target attribute, providing participant credit communication. Complete is a good supplement as the basic material of each indicator. If the participant has any questions about the indicator, you can have a truly reliable credit evaluation by tracking the original material. There will also be special organizations in the system responsible for the operation and maintenance of the indicator system. Dynamic correction each associated parameters of each evaluation system associated with each other, making the system to develop more stable, more reasonable directions.
(4) "Test" specification, other fruitful accumulation:
"Test" is the basis for the order check, which is the basis of measuring the status of individual behavior, and is the core of forming a quality assurance system. As a specification, it is required to be corrected and perfect from the continuous practice. Other fruit accumulation, like a universal library, can become a resource shared by each participant in the system, becoming accumulated units. For the "test" specification, the system will invest technical strength to develop a tool for "testing" to improve the acceptance efficiency and authority of specific technical issues. The order of non-technical requirements requires maintenance of specifications and institutional maintenance.
(5) "Order" specification:
It should be more accurately all the participants to learn skills and experience, because the order is simple, because it is a common concept, therefore, any carving skills and experience related to orders for each part of orders are every The fruit shared with others. It is an important factor in harmony with collaboration.
V. Rules and Technology, System "Wealth" Accumulation
The accumulation of system wealth will require system and technology to protect.
(1) Development mode of project research and development mode:
The "Sculpture" system will encounter the "R & D" program like other development platforms or development models. "R & D" means too much attempt, you must endure more "waste" production. The "Sculpture" system will provide tools and programs responsible for the recycling and management of "waste". First requiring support for supporters responsible for recycling management. The project process is analyzed by technical means to help extract and locate valuable results to save research and development.
(2) All-round information collection and statistics:
The "Sculpture" system will provide detailed information on each participant regarding the information on the project, as well as the possible help. The leader of the project can track project progress and instantly adjust the operation plan. The project individualies can also understand their position throughout the battle through rich information. (3) Multi-platform, meet the technical solutions for any project management requirements:
Due to the difference in the project main body (initiator), the requirements for the project development process will have a completely different requirements. Enterprise users, more hoping to develop in a state of confidentiality in the project development process, while enjoying the "sculpture" system's individual evaluation system to the team's incentive role. Fully transparent projects pay attention to any case role in development details, and factors such as personalization. Different exchange habits also have requested the technical guarantee for system operation. The system can provide as much communication mode: forum, email system, instant messaging, video audio conferencing system, etc.
(4) Enterprise membership system:
The "sculpture" system determines the principal of interest as a business because companies are currently all the main business activities, and the company is composed of multiple units, and the interests of each unit have formed the interests of the company. Of course, the "sculpture" system is not ignored independent individuals of non-enterprise mains, such as students, enthusiasts, etc., because each participant in the "sculpture" system, regardless of background, identity, payment, etc., all systems participants are shared The credit evaluation system is the foundation of communication. The purpose of the company's membership system is to facilitate the operation of the system, because the system is not an air-building Pavilion, there is a need to have a smooth operation of the mechanism to protect the system, which will eventually feed back to each system participant.
All operating expenses of the "Sculpture" system include: development and implementation of daily maintenance, management, shared technology, will be obtained through public bidding, and accepted corporate membership or corporate membership fee or annual fee. In the early days of the system, because there are relatively large system implementation and development tasks, it will be mainly carried out by sponsorship, and the sponsorship will be stopped after the system is relatively stable. Non-members participants are completely free.
(5) The Supreme Manager of the System - "Management Committee":
The management committee, consists of member enterprises, and individual participants, and is responsible for the establishment of the open transparent mechanism. Including the transparent audit of the cost of doing costs, the adjustment system of the evaluation system is confirmed, regularly organized structural adjustments and updates, and the implementation and improvement of the system. Including the "management committee" system itself increases or decreases, it is its function. It is an institution and system that implements "public discussion".
Sixth, the first work of the "Sculpture" system, the system itself
According to the specification and project operation of the "Sculpture" system, this article will be presented to all participants as the first "order" of the first project of the "Sculpture" system. This article is looking for funding to sponsoring companies, and at the same time recruits developers to achieve this publicly transparent project development collaboration system and platform that belongs to all participants. The following is the other part of the order prepared according to the requirements of "order":
Author: Yuan Dejun (before the system is established, there is no system of ID and individual evaluation file after the system is built, this column will have at least one, in order to uniquely identify your file ID in the system that you can use your own name, yet. Profile, occupation, hobbies, even personal signatures, the system will pass the content provided by this column and the system archive ID)
Overview: The "Sculpture" system is an open-transparent project collaborative development platform. Through the project evaluation system, individual evaluation system, and rich technical means to save project collaborative credit communication, avoid development, malignant competition system platforms. Collaborative platforms that are carried out by the "Public" institution of the Enterprise Member System and the Supreme Management Committee. Transparent Open people are the concept of development. Keywords: "Sculpture" system, collaborative development platform, corporate member system, "management committee", project evaluation system, individual evaluation system, credit communication. (The system will establish a secondary index by scanning the body, to supply query and retrieval) body: ()
Aid plan: (Because the system has not yet been established, the individual evaluation system, quantitatively dividing and describing the feature of the assistant, only by detailed explanation of the desired aid. After the system is established, the quantitative indicator will be The system, the system is automatically bidding. On the basis of automatic bidding, the responsible person also needs to describe the individual difference by detailing the text to compensate for the error of the automatic indicator system, and provide basic material for the performance system. Issues related to the timeliness, It is also determined after the establishment of the secondary and other management committees.)
1. Sponsorship Enterprises: There is enough agreement to the "sculpture" system. Willing to provide the development funds required for the establishment of the "Sculpture" system, and the maintenance costs required for system operations. Will be the first member. Willing to serve and have become members of the Management Committee. Sponsorship will be used as operational costs, which are borne by all participants of the system. Through the establishment of the system, it is necessary to pay first. Plan 1: Media with appeal can obtain more participants through publicity. Plan 2: Cradlers of newborn strength developed by vocational training institutions. Plans 3: Software companies with a certain scale. (Description: Since the system has not been established, only the plan is still in the planning phase, how much the company is recognized by the company. The plan cannot be required to accurate enterprise size, such as the number of employees, etc., the principle is the most favorable, based on system development. By negotiation, it is determined. This description should belong to the "test" order because the nature of this order is only necessary to explain it). Plan 4: Institutional colleges engaged in sociological management research, providing staff from the high degree of theory. (All the above plans, there is no level difference, is the "sculpture" system development must have an important role in the initiative of the system.)
2. First batch of individual participants - developers. Before the system is established, the individual participant information cannot be efficiently maintained, and can only be completed in manual way, namely the material developed by the system, is also a talent that the reserve system is developed. The "Sculpture" system is now required to be 2 types of talents:
A, a general engineer: According to system design ideas (refer to all text, key reference system "wealth" discussion part), clear plan, system development, and compute subsystem orders. And comprehensive responsibility of the entire system construction project. It will be recommended as members of the management committee to give recommendations in the technical direction of system construction. To make a detailed explanation of the 2 stages of the budget, it will illustrate the risk changes, as well as time-effective factors. Plan 1: There are experienced experienced by the project planning management, and the plan is two project planning management experience in considerable project planning. All the above needs to submit a case and personal resume, and after the management committee is recognized, Be the first order of the first order for the "Sculpture" system. The standard standard is not defined, please submit itself with your own experience, which will become the basis for the first format document accumulated by the system as the basis for the other order responsible person in the future. If your bidding is not selected, you can still be used as a member of the assistance to participate in the system. B. Sub-system engineers are several: to establish a personal evaluation file, the reserve system talent library is purposeful. According to system design ideas (refer to all textures, key reference system "Wealth" discussion part), think that they can be competent or wishing to work, anyone can apply (submit personal resume, explain good fortunate or hope to engage in it. Work), after the adoption of the management committee, establish a personal evaluation file. This process will be launched after the chief engineer arrived, and the applicant can also understand the work that will be engaged in the work of the head. All submitted personal resumes and files will remain in the system after the system is established. Unable to participate in system construction does not indicate your ability or other aspects of the problem, it is entirely the need for system building organization coordination. After the system is established, you will first enjoy the system to create your own personal evaluation file to start your practice.
c, "Sculpture" system documentation maintenance person: responsible for the preparation of administrative documents generated by the "Management Committee", and is responsible for the archiving of technical documents related to system project development, and the technical documentation of each subsystem project has arranging documents. Managers or solve themselves. Plan 1: There is a considerable project document management experience, with a certain textual foundation. Schedule 2: There is an administrative education background, software enterprise experience, profound writing skills, and IT writing experience is good. 2 Please submit your resume, and indicate the treatment needs (this position is full-time), you can indicate the systematic individual evaluation system.
D. The requirements for personal resumes do not do content, it is the first information you express from others. However, ask the following information, will be the only identification of your future personal evaluation file: the Chinese ID card number, name, gender, date of birth (as a way to notify you personal file ID confirmation letter, the system will press Sequential attempt to send confirmation information): Email, mobile (SMS), instant messaging contact (QQ, MSN, IMU), contact phone. And after the system is established, you can send information on the designated media, you can log in to search the official website to search for the above information, determine your archive ID, this ID will be detailed for your personal evaluation, as you with other participants The basis of credit exchange. In confirming ID, you can add or reduce the personal data required by the system database, the credit record can only query and cannot be modified. (Resume delivery address: sculptor@ngnc.net)
3. Subsystems that may be included in the system for reference. At the same time, the establishment of the Acer Control Council and the "Public Discovery" platform will gradually implement more specific. The important responsibility of the head office will also be a detailed communication with the spokesperson of the management committee, and complete the system planning under the premise of system rules. The current planning of the system is relatively vague, only directional ideas. The initial requirements for the establishment of the system are: establishing the information publishing platform, providing the communication method based on existing communication means, building system platforms with "accumulation" targeted, accurately, is the system debug platform, is a must stage. Recent goals: Establish research and development as a relatively clear part of the blueprint, as a subsystem for research and development, and establish a research and development sub-project with the management committee first through the determined system development direction. At present, in addition to several systems and development projects described in the first order, there are the following directions, and the management committee is discussed to confirm. Including: "Sculpture" system humanistic spirit, you can establish a system of articles such as blog and other means to publish the system, the promotion system itself is the spread of collaborative concepts;
Database, relevant project development experience, accumulation of cases, thesis and results in various technical fields;
Product libraries, provide the basis for the previous research of project development, existing development results (system production, or external production) can be used as the starting point of any project;
Communication means, web information platform, forum construction
Introduction of instant messaging products, and additional features for project management and collaboration;
System physical structure requirements are distributed databases, and members can save a small-scale project collaboration platform, and educational institutions can establish basic personal evaluation files for new students. The information terminal can be distributed anywhere, and the interest group can completely enclose the use of instant messaging. Waiting for the miniature project collaboration system of the PC platform. For example: PC platform can use free database platform or popular easy-installed Access, personal computer HTTP server, FTP server, QQ, MSN, IMU, etc.
The following article can learn more about the "sculpture" system more fully:
"Sculpture" System - Open Software Project Collaboration Platform "(this article)
"" Riddle "system -" order "auxiliary generating system" (for system design reference)
"Engraving" - "Sculpture" System Operation Design "(for system design reference)
"Sculpture" System Construction Plan "(development! Development! Or development!)