(Feasibility Research Report) [Part3] b. New equipment that needs to be purchased.
New equipment purchase situation
Equipment name
Quantity
price
Total price
use
have to
Lenovo Wanner Server
2
Provide IIS, COM distributed computing services.
Yes
Support SQL Server 2000
Lenovo Wanner Server
1
Computational Center Support Student Online Examination System
Yes
PIII 1G, 128M RAM or more
1
Information department provides information services
Yes
High-grade microcomputer
PIII800, 128M RAM or more configuration microcomputer
1
Academic Office Examination System
Yes
PIII800, 128M RAM or more configuration microcomputer
1st
Information AC terminal
Yes
Intelligent HUB
3
Implement system interconnection
2. Influence on existing software: None.
3. Influence to users: Systems require most users with general microcomputer operation experience. The system must be equipped with at least one of DBA (Database Administrators) and SMA (System Administrators).
4. The impact on the operation of existing systems: None.
5. Influence on the development environment: None.
(2) Technical feasibility assessment.
1. The function and performance goals of the system can be achieved under the suggestion development unit restrictions.
2. Using the prior art, the function and performance goals of the system can be achieved.
3. The number and quality of developers can be reached.
4. During the specified period, development can be completed.
6. It is recommended to develop system economic feasibility assessment.
(1) Expenditure.
1. Infrastructure investment. With hardware costs, system software costs, application software costs, construction costs, user training costs, unpredictable fees, operating costs (personnel fees, network operating costs, maintenance costs, consumer goods). (Not detailed). ).
2. Other one-time payment: 80,000 yuan.
(2) Benefits: Not available.
(3) Sensitivity analysis.
System survival period: no less than 10 years.
The workload of the target system is required to meet the needs.
The processing speed of the target system is required to meet the needs.
VI. Social feasibility analysis.
1. Legal factors: Responsible for the development of the company's reuse rights.
2. User uses feasibility: It is recommended to develop unit staff to meet the requirements of the system.
Eight. Conclusion: It is recommended to develop systems to organize development.
-----------------------------------------statement-------- -------------------------------------------------- The document is written in the end of 2001 (Big Twenty), and the adoption of the adoption of SA, SD is limited by the school technology competition, and the SD is limited, the time is not enough, the document is wrong and the deficiencies, please contact 81_Redstar @ 163 .com ----------------------------------------------------------------------------------------------------------------------- -------------------------------------------------- --------