(Project Development Plan) [Part1] I. Introduction
(1) Writing purposes. This project development plan is used to issue problems such as resource allocation, development, development schedule from overall planning projects. Reading objects: project supervisors, system analysts, advanced programmers
(2) Project background.
1. Project commission unit: Wuhan University. 2. Development unit: Joint Software Technology Laboratory.
3. This system will have information sharing and integration with existing systems such as library information systems, caferatation, category card system, Academic Affairs Office Examination System, Computational Center Online Examination System.
(3) Document definition
DB Database
SQL STRUCTURED Query Language
IIS Internet Information Server
Com Component Object Model
DCOM Distributed Component Object Model
ASP Active Server Page
XML EXTENSIABLE MAKEUP LANGUAGE
SOAP SIMPLE Object Acess Protocol
UDDI Universal Discovery Description and Intergration
C # c sharp
Lan Local Net
(4)
Reference
:
Feasibility study report
.
II. Project Overview.
(1) Work content.
The main task of this project.
1. Data center database design. (Features: Store all information.)
2. Data Center COM layer. (Features: For web service page services. Provide DB interfaces for the information service system of the information management department.)
3.DCOM layer. (Function: Provide the test system and the doctor DB interface through the LAN.)
4.Web Services layer design. (Features: Landing UDDI, sharing this school question bank. Share other school information via INTERNE.)
5.ASP.NET Service page design, WML service page design. (Function: A variety of forms of inquiry to achieve any disciplines on the Internet (with teachers), students can record their personal achievements Enter feedback; realize the online registration of the elective course, so that the teacher is online to enter the score; realize personal information inquiry; realize personal dining card and balance query; realize personal borrow information inquiry. Implement students (including compulsory and elective class ) Enter the database online and you can join a note (such as the absence of students, the operation situation, etc.). Synchronize the information AC terminal that implements students' information.)
6. Computational Center Online Examination System Design. (Features: Provide student online exams.)
7. Information management department information service system design. (Function: Providing information services for various departments.)
8. Design of information exchange terminals in each department. (Function: Information exchange with other departments.)
(2) Conditions and restrictions.
1. The laboratory must set up a system test network.
2. Student wireless device information service system supports environmental requirements.
(3) Products.
Program.
a. (Information Center) Information Database System. (Design Language: SQL, XML.)
B.COM module layer. (Design Language: C # .vb.net, SQL, VC . Net.)
C. DCM module layer. (Design Language: C # .vb.net, SQL, VC . Net.)
d. Web Services layer. (Design Language: VC # .vb.net, SQL.)
e. Student information service system. (Design Language: c # .vb.net, SQL.)
F. Student wireless device information service system. (Design Language: WML, WMLScript, C # .vb.net, SQL.)
g. Teacher Information Enter System. (Design Language: C # .vb.net, SQL.)
h. Student online test system. (Design Language: c # .vb.net, SQL.)
i. (Information Management Department) Information Service System. (Design Language: XML, VC # .vb.net, SQL.).
J. (Department of Departments) Information AC Terminal. (Design Language: XML, VC # .vb.net, SQL.)
2. Storage form.
3. Delivery documentation: User Operation Manual, Program Maintenance Manual.
4.
Operating environment
(a.
Hardware environment
b.
Software Environment
.) System runs soft and hard environment demand table
Submit system
Department
Hardware environment and equipment (excluding network) software support environment
Network environment and equipment
Information database system
Lenovo Wanner Server
Windows.net IIS, COM distribution
Environmental services. Contains Data Center.
Through intelligent HUB or pass
COM layer, DCOM layer
Campus network realizes system interconnection.
Web Services layer
At the same time, it is guaranteed to access the ITERNET.
Student information service system
data center
Lenovo Wanner Server
Windows.net IIS, COM
Note: Students Wireless Information Service
Distribution environment and other system services
Universal must access the WAP gateway.
Teacher information entry system
Student wireless information service system
WAP gateway
Examination system
Academic Office
PIII800, 128M RAM or more configuration
Win2000 Server
Ordinary Hub Access Campus Network
Information service system
Information management department
PIII 1G, 128M RAM or more
Windows2000 IIS, COM
Ordinary Hub Access Campus Network
Distribution environment and other system services
Information AC terminal
Various departments
PIII800, 128M RAM or more configuration
Windows2000 IIS, COM
Ordinary Hub Access Campus Network
Distribution environment and other system services
Student online test system
Calculation center
Lenovo Wanquan Working Group Server
Windows2000 IIS, COM
Distribution environment and other system services
Ordinary Hub Access Campus Network
(4) Service. Commitment to provide services: personnel training, system installation, warranty.
(5) Acceptance standards: system function, performance, stability, interface, etc. to meet customer needs.
-----------------------------------------statement-------- --------------------------------------------------
The document is written in the end of 2001 (Big Twenty), and the adoption of the adoption of SA, SD is limited by the school technology competition, and the SD is limited, the time is not enough, the document is wrong and the deficiencies, please contact 81_Redstar @ 163 .com ----------------------------------------------------------------------------------------------------------------------- -------------------------------------------------- --------