RFC4 network schedule

zhaozj2021-02-16  46

Organization: China Interactive Publishing Network (http://www.china-pub.com/)

RFC Document Chinese Translation Program (http://www.china-pub.com/compters/emook/aboutemook.htm)

E-mail: Ouyang@china-pub.com

Translator: YH_2001 (YH_2001 sflu@Netbig.com)

Translation time: 2001-4-2

Copyright: This Chinese translation copyright belongs to China Interactive Publishing Network. Can be used for non-commercial use free reprint, but the translation and copyright information of this document must be retained.

Network Working Group Elmer B. Shapiro

Request for Comment: 4 Stanford Research Institute

Category: Informational 24 March 1969

RFC 4 network timetable

(RFC 4 Network Timetable)

table of Contents

1. (N10) Network Test 2

2. Communication tool installation 8/1/69 2

3. Design and constructing master-IMP9 / 1/69 interface 2

4. IMP i installed 9/15/69 2

6. Test communication 10/15/69 3 in UCLA-SRI

7. Test communication between UCSB-SRI 11/15/69 4

8. Test communication between UTAH-SRI 12/15/69 5

9. Run a single TTY system 6

10. Simple typewriter system 7

11. No local feedback is running on any terminal 7

13. Mobile file 7

14. Development of commissioning skills 7

1 (N10) Network test

2 Communication tool installation 8/1/69

2A requires space, capabilities, and cable detail specifications from AT & T and / or BBN.

2b Need to develop SRI expected alternate positioning to determine the maximum Telco cable length.

2C requires a location to adjust and circuit.

2D requires circuit information to express internal call information.

2E Need to organize and install A.c. (equivalent to 4b).

2f watch 16

3 Design and Construction Master-Imp9 / 1/69 Interface

3A needs a detailed manual for BBN.

3B design trial development

3C examination system programmer

3D to develop the final plan

3e establishment and design hardware

3F Testive debugging software and hardware circulation test

4 IMP i installed 9/15/69

4A requires space, capabilities, and cable detail specification from AT & T and / or BBN

4B sorted SRI and install A.c. (with 2E)

5A Gets list of errors and procedures from BBN

5B write program debugging in BBN

5b1 transmission test information

5B2 test procedure

5B3 checks message population in the program

5C T Attempt Transfer Test

5C1 confirmed to transfer to IMP

5C2 confirmed from IMP transfer

5C3 confirms from IMP cyclic transfer

5D design IMP overload and restart

6 Test communication in UCLA-SRI 10/15/69

6A network configuration

Sri |

|

|

|

|

|

|

|

UCLA |

6b agreed to test communication information on UCLA

6B1 initialization

6B2 order

6B3 check

6B4 test procedure

6B5 report error

6D test transmission order

6E measurement delay

6F UCLA cycle

6G system response invalid and illegal conditions

6h loss and recovery equipment

6h1 communication connection

6h2 IMPS

6h3 hosts

6i development network double report plan

7 Test communication between UCSB-SRI 11/15/69

7A network configuration

Sri.

.

.

.

.

.

----------------

UCLA UCSB

All of 7B 6

7C load network replacement effectively

7D development expression equivalent

3 directions of 7D1 conference

7D2 design and establishment of meeting arrangements

7D3 conveying conference Arrange to UCLA and UCSB

7e ring path communication

7e1 via IMPS

7E3 six tests

7E3A UCLA-I, UCSB-I

7E3B UCLA-H, UCSB-I

7e3c ucla-h, ucsb-h

7E3D UCSB-I, UCLA-I

7E3E UCSB-H, UCLA-I

7E3F UCSB-H, UCLA-H

8 Test communication between UTAH-SRI 12/15/69

8A network configuration

Sri. --------------- UTAH

.

.

.

.

.

.

.

.

UCLA ---------------- UCSB

8b Select a pre-test group

8B1 all the same 6

8b2 7b

8C expansion expression

8C1 UTAH has passed the SRI access UCLA and UCSB

8C2 with BBN and ARPA

9 run a single TTY system

9A Single User Access

9A1A A to B

9A2 uses the host name

9A2A A to B

9B multi-user access

9b1 on the server

9b1a a, c to b

9b2 from the user machine

9B2A A, A to B

9B3 different products

9c login, exit, enter and exit subsystem

9D processing error message, crash, recovery

9E formatted information format

9F development agreement

9g file storage and recovery

9h requires a user manual to give each site

9i needs to develop schedules

9J Need to set User Name NEED TO SET USER NAMES

9K design and establish CMM execution and its same thing

10 Simple typewriter system

10A and 9C - 9G

10b How to define when all-in-two workers or half duplex

How to set "BREAK"

11 There is no local feedback to run on any terminal

13 mobile files

14 Development and commissioning skills

14A error detection

14A1 consistent operation

14A2 "Reasonable"

14A3 exchange use of each other

14B Limitations

14B1 synthesis Comm-IMP

14B2 host service

14B3 use host

14B3 Try other programs

14b5 Monitor subsystems in a "LINK" program in a possible situation

14B5A uses separation computer communication

14b5b uses a consensus channel

14B6 mobile channel message

14C decision goals

14D Target Revision

[This RFC WAS PUT INTO MACHINE READABLE FORM for Entry]

[INTO THE online RFC Archives by David Capshaw 11/97]

RFC 4 Network Timetable RFC 4 Network Timetable

1

1

RFC Document Chinese Translation Program

转载请注明原文地址:https://www.9cbs.com/read-27263.html

New Post(0)