PSP process

zhaozj2021-02-17  49

PSP process

to sum up:

During the PSP process, data such as time, defects, and final comparison plans and actual results are summed up, and various deletions are summarized and improved in the next process. Various deletions include the problem of the process itself.

Process is performed 1. Process script definition XXX work process script

Numbered Destination Guidance 1. Enter standard ... 2 Plan ... 3 development ... 4 summary ... 5 Exit standard ... 2. List of tasks (activity) list

Task Time Project will be 15: 30 ~ 17: 00 every Friday

3. Project plan

3.1 Workload estimation table

Number Working Description Estimation Workload Minimum Average Maximum

3.2 Work plan

Number Date Description Estimation Data Average Data Time Quantity Average Minimum Summer

3.2 stage schedule (plan) table

Week Task First and Three Four Five - day Week Total Meter Real Meter Real Meter Real Meter Implement

Day total

Gauge: When you plan; Real: actually use

3.3 Work priority list

Work priority

high

low

4. Develop a contract

Precautions for formulating contracts

1) Before the agreement of the contract

2) Contracts must documentation

3) It is necessary to notify the other party in time when it can meet the contract, and strive to reduce the impact to the lowest level.

4) Support contract

Contract list

Contract content Another constraint signing date

5. Record of time logs

Date Start Time End Time Interruption Time Activity Remarks Complete Workload

6. Record of work logs

Date affairs

7. Progress management

7.1 Develop a list of checkpoints

Large projects set the checkpoint for the cycle of two to three days, and the small project can set the checkpoint for one day or hour.

Check points must be clear and clear, no ambiguity is available. The checkpoint must be a particular action, either completed, or not.

Example: Good checkpoint

Completed the design of the XXX program and complete the design document.

Example: bad checkpoint

90% of the XXX program

Checkpoint list

Number checkpoint check standard / basis

7.2 Tracking Project Plan

It is recommended to use the Gantto (Gantt)

8. Defect management 8.1 Develop standard defect type table

Number name description

8.2 Recording Defect Log

Date Number Type Introduction Stage Excluded Stage Modification Time Repair Defect

description

description

description

description

description

Description: Repair defect refers to the defects introduced by another defect, fill in the corresponding defect number.

8.3 prediction of defect

Work number predictive defect (a) actual defect (one) predicting density actual density

8.4 Prevention of defects 1) Develop work specifications, such as code specifications, design specifications

2) Design work review process, develop work review script

3) Develop a review guide and checklist

According to the error chance, it is improved in the process of making personal review tables (defects in a prolonged order) process. Summary of the table using the PSP project plan This table is too large and cannot be released. Please check the PSP-related information yourself.

2. Review process

3. Improve process, adjust process script