Test plan (GB8567-88)
1 Introduction
1.1 Writing
The specific written objectives of this test plan indicates the expected readers.
1.2 background
Description:
a. The name of the software system from the test plan;
b. The development project history, lists the computing centers of the user and the test of this project, indicating that the work that must be completed before the implementation of this test plan is started.
1.3 definition
List the definitions of the specimen used in this document and the original phrase of the foreign letter group word.
1.4 Reference
List the references you want to use, such as:
a. The approved planned task book or contract of the project, the approval of the superior authority;
b. Other published files belonging to this item;
C. The documents, materials, information, including the software development standards you want are included in this document. List the title, file number, publishing date, and publishing units of these files, indicating that the source of these files can be obtained.
2 plan
2.1 Software Description
A chart is provided and a quality indicator such as the function, input and output of the measured software is described one by item, as an outline of the narrative test plan.
2.2 Test Content
List the name identifier of each test content in the assembly test and confirmation test, the progress arrangement of these tests, the content and purpose of these tests, such as module function testing, interface correctness test, data volume access, Test, design constraints, and limit tests.
2.3 Test 1 (identifier)
Given the participation unit of this test and the part of the tested.
2.3.1 Progress Arrangement
Give the schedule of this test, including the date and work content of the test (such as familiar with the environment. Training, preparing input data, etc.).
2.3.2 Conditions
The statement of this test work on resources, including:
a. Equipment type, quantity, and predetermined usage time used by the device;
b. Software Lists the software that will be used to support this test process and it is not part of the measured software, such as test drivers, test monitor, emulator, pile module, etc.
C. Personnel List the number of people who are expected to be provided by the user and development task group during testing. Technical levels and related preparatory knowledge, including some special requirements, such as inverttime operations and data types.
2.3.3 Test Information
List the information required for this test, such as:
a. Documents concerning this task;
b. Test procedures and their media;
C. The input and output of the test;
d. The method of controlling this test, the chart of the process.
2.3.4 Test Training
Explanation or Reference Document Description Provides a training for the use of the test software. Provisions on training, those trained and engaged in training staff.
2.4 Test 2 (identifier)
A test work plan for another and subsequent test content is described in a similar manner to this test program 2.3.
3 test design description
3.1 Test 1 (identifier)
Description Test Design for the first test content.
3.1.1 Control
Describe the control method of this test, such as input is artificial, semi-automatic or automatic introduction, sequence of control operation, and results of the result.
3.1.2 input
Describe the input data used in this test and the policies to select these input data.
3.1.3 Output
Describe the expected output data, such as test results and possible intermediate results or operational information.
3.1.4 Process
Note One step and control command to complete this test, including preparation, initialization, intermediate step, and running mode of the test.
3.2 Test 2 (identifier)
The design considerations of the test work after the test work are similar to this test plan 3.l.
4 evaluation principle
4.1
Note The selected test case can be used to check the scope and its limitations.
4.2 Data Ordering
The statement describes the test data to facilitate the evaluation, so that the test results can be compared to the conversion processing technique to be used, such as manual or automatic mode; if it is used to organize data, Explain that the hardware and software resources to be used for processing. 4.3 scale
Description Use to determine if the test work can pass, if the type of reasonable output result is used, the test output result is the maximum number of interrupts or downtime to allow interrupt or stop.