And a company's technical director exchange experience

xiaoxiao2021-03-05  39

After the exchange, I thought a lot in my heart, summarized the following:

1. For my individual, more satisfactory projects:

CCB Investment Management System (after the school comes out, a person completes the first comparative system, standardized small project, customer is more satisfied with 2004-04)

Panyu Traffic Police Integrated Information Network (developed ASP for so long, first contact ASP object-oriented ideas and DHTML, and gradually mastering this technology, it is a change in the power to personal ASP technology, for ASP Have a new understanding. 2004-08--2005-03)

China Trade Guangzhou Exhibition Company Portal (this project is a longer project. During the project development process, more comprehensive familiar with ASP.NET (C #) development model, more experience in practice Dowamish architecture High efficiency and can be skilled in ASP.NET to use C # development and ADO.NET, summarize the development model that can make themselves. 2004-10--2005-03)

Guangzhou Baiyun Environmental Project (this project is the first project of our technical group after our supervisor leaving the company's development, one person completed the need to organize, analyze, document preparation, frame design, coding, testing, and after-sales support, in the project The development time required, the unpredictable factors in the development process have a new understanding, so that they have a better grasp of the project in macro. At the same time, this project is very satisfied with the company's advisory, basically in the process of the other party. There is nothing to make a modification, which has enhanced the confidence in which you are in greater tasks. 2005-04)

2, writing of documents

The writing of documents is still important in a project management. There is no system's needs analysis documentation and summary design documentation, almost unable to manage the project team members under the hand. It is not possible to communicate well with superiors (communication only on project processes). At the same time, for a project manager, the program planning capabilities, demand analysis capabilities, and summary design documentation is indispensable. It is also necessary to better understand the relationships and side focus of each of them.

The program planning is to give the customer, whether the customer trusts us, whether to assure the project to us to develop a project not only to handle each other's relationship with the customer, but also need a good planning plan, let customers see the plan It will be clearly known that our products can be competent in the needs of our customers. During the product use process, we can improve our customers in relevant aspects, allowing customers to make effective communication in all aspects.

Demand Analysis Document is a document between summary design and program planning. Written by the project manager, which involves the process steering in each process, the relationship between the various processes, precautions, development purposes, and ultimate needs to achieve any effect.

The summary design is mainly to developers, this is very important, which involves the specific implementation of the procedure, perhaps this exceeds the project manager's work, but in the incomplete company personnel, the project manager should also be able to do it. This original is a document written by the system analyst.

As an excellent project manager, I think the above should be done.