Since the work time of the teacher arranged from April 1 to May 15, there was only 7 weeks. I will be roughly divided into the following:

1. Implement the player and the camera on the PC. (Compare a complete frame)

2. Quo the basic functionality of the SDK is debugged on the CE.

3. Implement the basic functions of the player on the CE.

4. Implement the dump function of the player on the CE.

5. Install the camera on the CE.

6. Implement the basic operation of the camera on the CE.

7. Improve the entire procedure, customize a complete system, implement it on the experimental equipment.

In these 7 steps, step 1 has been basically completed. At present, step 2 is in progress. From the overall look,

Basically, one step is completed.

The camera in step 5 may have a certain problem, because it has not found the products driven under CE at present, and it is planned to be experimentally with the PC. Part 7 will be affected.

The features of the fourth step are to be defined, and the format conversion is not suitable on an embedded device, and it is understood as a forwarding of the video stream.