1. Requirement 1.1 INPUT: As start point, there is no element input 1.2 OUTPUT:. Requirement Doc 1.3 OBJECTIVE:.. Descript the business logic, and confirm the functions of the system 1.4 COMMENT: Due to unknow quantity of module, the schedule Will Be worked out at this phase.

2. UI Prototype 2.1 INPUT:. Requirement Doc 2.2 OUTPUT: UI built with C # 2.3 OBJECTIVE:. Confirm the work flow, and reduce different or confused meanings 2.4 COMMENT:. The prototype may be different with useable system.

3. Architecture 3.1 INPUT:. Requirement Doc 3.2 OUTPUT a Hardware Infrastructure:. Doc b Software Architecture: Doc 3.3 OBJECT: Confirm hardware infrastructure and software architecture and their versions.

4. System Design 4.1 INPUT: UI Prototype and Architecture doc 4.2 OUTPUT a Demain Design:.. Visio Diagram (Class Diagram) b DB Design:. SQL Script c Interface Design:. Class Diagram (or other diagrams) d Test Case.: DOC 4.3 Objective: Confirm Entity Classes and Boundary Classes, Provide All Documents for Coding.

5. Coding 5.1 INPUT: System Design Doc 5.2 OUTPUT: Useable and testable system, with expected format, such as exe, jar, war, etc. 5.3 OBJECTIVE: Implement all business logic, according to system design documents 5.4 COMMENT:. Unit Test SHOULD BE HOLD ON.

6. Test 6.1 Input: Useable System, Test Case Document 6.2 Output: Deployable System 6.3 Object: Find Out Defects as Possible. 6.4 Comment: Coding and Test May Be Alternant.