Workload estimation based on the use case

xiaoxiao2021-03-06  14

original:

Workload estimation based on the use case

Source: IBM-900 (DW)

Time: 2005.2

Summary: This article describes a framework based on the use case. In order to make the description more, this article is selected for the framework parameters, although these values ​​have been argued, they are not always wrong. As usual, with the collection of data, this estimate should be tested according to the actual situation and the re-estimated parameter value. This framework considers ideas such as the use case level, scale and complexity, and no longer takes fine granular functional decomposition. To mitigate the calculated burden, for tools such as Estimate Professional, a front end can be constructed to provide a different method based on the size input based on the usual.

转载请注明原文地址:https://www.9cbs.com/read-47070.html

New Post(0)