Ask, how to draw an intermittent line in OWC

xiaoxiao2021-03-06  19

Pictorial in OWC is good, but unfortunately, some data in the database does not exist, the problem came out:

For example, there is twelve months a year, may sometimes have data in July, the first time to paint, it is the data after August, and sweat. .

Later, I changed it, put the year of no data as 0, the result is very difficult, completely destroyed the direction of the curve

However, in Excel is a curve with interrupt, I don't know if I can implement it in OWC?

转载请注明原文地址:https://www.9cbs.com/read-49032.html

New Post(0)