February 28th plan completion

xiaoxiao2021-03-06  44

Technical article reading 1.1 Information System Construction Project Risk Assessment Method (http://www.csai.cn/edu/xmgl/xm_0402002.htm) This article mainly from the size and scope of the project, data processing power, technical capabilities and experience, management The model, the project operation environment is set to, and a set of assessment models is provided. 1.2 WEB-based system testing method (http://www.csai.cn/edu/test/web.htm) This article discusses web-based systems from features, performance, availability, client compatibility, security, etc. testing method. English Technology Document Reading Quickly Create Custom Project Guides Tutorial CHAP11 P530-P542 11.1 Computer Architecture 3.1 Development of Computer Directive System: Complex Directive System Computer (CISC), Limited Command System Computer (RISC) Before The speed is improved because the command is streamlined. 3.2 Improve computer system operation speed: a. Improve device process, improve integration and clock frequency; b. Improved architecture 3.3 pipeline technology

转载请注明原文地址:https://www.9cbs.com/read-52456.html

New Post(0)