2005-1-27 mood is super uncomfortable

xiaoxiao2021-03-06  40

IHE: Final Report refers to a report that Completion Flag is set to the complete and auditing flag (Verification Flag) is set to Verified report; other situations are considered draft report (Draft Report)

Check out the definition of these states in the DICOM standard, download the new version of DICOM standards and other related documents.

Written a base class for encapsulating the DLL, as for the use effect, it is ready to be inspected;

转载请注明原文地址:https://www.9cbs.com/read-63348.html

New Post(0)