The wrong specification is not more terrible

zhaozj2021-02-12  185

Come to the company for more than a week, have been doing demand analysis. Recently, the staff in the project group is relatively large, and the module I am responsible is also changed, and it is very uncomfortable. It is now responsible for system management and system maintenance of two modules, which is the most difficult, including workflow, multi-level menu, data dictionary, and so on. This project is the first use of standardized processes for the company, so everyone has no experience. During a few days, I feel a lot of problems.

Let me talk about demand analysis, now the biggest problem is that the demand is not clear, when the module, the manager is just simply saying, and then let us go online to find an example to see the analysis. After listening to a cold, if this is called the needs analysis, then the system analyst should be a very easy to be a very easy to get, what is made, @ ¥ ##% ......

Another issue is the lack of communication within the project team, so that there is no overall understanding of the entire project, the manager does not communicate with us without the basic problems of the project, just a standardization of the process. As a result, the process is standardized, the method is wrong, what is the use of this specification? Unifocate the error? !

Let me talk about data modeling. The first day of work, I will let me write a document on modeling. I wrote that managers don't seem to see, or I don't want to follow the execution of the above. It may be that I have written too complicated, I will misleate everyone, I will cut off the domain, inherit, and PDM in my document, and even expressed doubts about me using Association. Then, in his modeling method, a modeling specification was, I saw a product under this specification, and it was clearly used to build CDM with PDM. Relationship actually add foreign key, my god, this is Do you? !

Another problem is that the table name and field name requires all the pinyin ablation, I don't know what kind of consideration is required to do this (confidential?), In short, I don't understand. My state is like a lacunk when I first build a table, and the serious weight loss (I said that I am pinyin).

I have given the manager by the above questions. As for the injury, it is not within my control.

It used to be a profession of the system analyst, and I also read a lot of books in this area. Now I seem to have a lot of differences, mainly the lack of experience, so I am old and old. Gradually strengthen the framework and analytical capabilities.