Task driver management practice

zhaozj2021-02-12  174

Task driver management practice

Overview

Task driver is not a one-way task issuance process, but an interactive task allocation process, in which people must be centered, people-oriented.

Task element

mission name

degree of difficulty

Need skill

schedule

Responsible

Verify

SF

XXX function development

Assessment according to historical data

And the responsible person is jointly determined

Choose

What is output?

Who is verifying

Overall task division

mission name

Need skill

Verify

SF

demand

Business knowledge, modeling technology

1. All future use of the role definition (role name, role description)

2. The atomic function that the system should provide (this function corresponds to business processing) and describes the function (describe the entire processing process)

client

analysis

Business knowledge, modeling technology

1. All business handling interfaces, business entities, business control

2. Each business process in the demand phase is implemented with the above tool (business interface, business entity, business control).

Demand personnel

design

Design experience, modeling technology, related development language knowledge

Object model

Class a. Class definition

b. Interface documentation

2. Data model

Business data

b. Security data

c. Process definition data

3. UI model

a page

b. Page element description

4. Use the above three models to achieve the use case of the analysis phase

5. System framework (code, data, directory, file)

Analyst, developer

achieve

Related language knowledge

1. Function Source Code

Testers

test

Related language knowledge, test experience

Test case

2. Test report

client

Performance Assessment Contribution = SUM (Difficult Coefficient of Task * (Plan Time - Actual Completion Time * Coefficient)) / SUM (Contribution of Everyone) Performance = Project Performance Coefficient * Contribution Task Assignment Template

Task coding

founder

Xinwang Video Technology Development Department Project Group

Receiver

project name

IdV

Hierarchy

function name

coefficient

0.5

Assign people

Allocation time

planning time

verify the time

The actual completion time

Time difference

Calculated in 2 hours (8 hours per day)

contribution

(Actual completion time - confirmation time) * coefficient

Receive person signature

tester

Task status

Unallocated, allocated, completed

content

Class list:

Reference

Source code

2. Design model

3. Platform interface document

Note

Description: 1. According to the task code digital suffix from small to large execution 2. The coefficient is set by the designer; in the early days, the responsible person can ask questions; 3. The coefficient is determined by the difficulty coefficient and complexity coefficient; 4. Plan time by project management According to the difficulty factor; 5. The confirmation time is determined by the responsible person and the relevant management personnel.

转载请注明原文地址:https://www.9cbs.com/read-7329.html

New Post(0)