The development principle is to test the first, iterative development, and the continuous increase in function, design and code are reconstructed at any time as needed.
Overall plan: 1. Personnel I 2. Method to formulate the schedule plan of the stage milestone target, summarize the evaluation of the last phase of the task completion when the next phase begins. 3. Tools and Technology JBuilderx, Tomcat5.56alpha, MySQL4.1.8, Struts, Hibernate, Spring, Junit, Ant, XML, Log4j, XDoclet, OSCache, Maven, CVS, etc. The process of doing project is also a process that is familiar with these technologies. 4. Process and Result 1) Develop a function list, estimate the time required to complete each function, and the bug submitted after the function is submitted. 2) Every two weeks Release a load3) Maven CVS for project code, management of documents 4) Working 15 hours a week
The first stage (01/03 / 2005-?)
Me
05WK01 plan
Target Number Task Program (Hour) Tomcat and MySQL 2 Review Log4j, Determine Basic Build Method 2 Review Ant, Determine Test Method 1 Learn XDoclet, Determine Test Method 1 Learning XDoclets, Understand Basic Fixed 2T0002 Learn Maven and CVS 6