Profitting time plan

xiaoxiao2021-03-06  41

The general plan will always be based on existing needs, considering market factors and resources, to arrange the development order of various work to obtain maximum output under limited resources and time.

Before making a plan, you need to first determine the important and urgent degrees of the tasks, refer to importance, and urgent degrees to determine its order.

Importance, the quotation of the emergency is as follows:

Important urgent urgent urgent urgency is not urgent

Important, emergency tasks must be prioritized when planning the plan, and not important, unstoppable tasks are finally considered. The dispute is more important in important and urgent tasks.

If you have an urgent need to be arranged first. It is necessary to work if it is necessary to work, otherwise it will affect the development progress. In fact, this is wrong, our prerequisites are time limited, resources are limited, and if they are prioritizing an emergency task, then important features will be abandoned because there is not enough resource potential, which affects users who are satisfied with the entire product. degree. The image is metaphor for picking sesame, throwing watermelon, can't get lost. This requires the importance of the important urgency of the initial determination task, requiring the correct nature of each task. In an iterative development, it is best to re-evaluate the important urgency of the task every time it iterate, in order to specify a reasonable and feasible plan.

Therefore, the correct priority is an important urgency, it is important and unstoppable, it is not important.

1. Important emergency 3, not important emergency 2, important is not urgent 4, not important is not urgent

Therefore, in the development of various ways, it is necessary to determine the important urgency of the task to maximize product functions in limited resources and time.