"Tenth" Shanghai ITS Planning and Implementation 2003-2-24 China Third Party Logistics Network
I. Shanghai ITS research, problems and gaps in the application process
1. Road network infrastructure is not perfect
ITS can play a lot of role in practical applications, to a large extent, depending on the construction of urban infrastructure. Although ITS can monitor and dispatch vehicles, improve the efficiency of transportation systems, but unable to solve the deep contradiction between limited road resources and huge, rapidly growing travel needs. ITS needs to further improve system operation efficiency on the basis of perfect urban transport infrastructure, solve traffic congestion, safety and environmental issues. At present, Shanghai's overall road network system is still not developed, has not formed a modern, stereo modern traffic network.
2. Fund issues
Realize the intelligent scheduling of the entire urban transportation system or bus and taxi, realize intelligent traffic management of each road, each vehicle needs to be equipped with information receiving system, and each road must be installed and monitoring system, you need to invest huge funds. At present, our economic strength has a large gap between the developed countries in Western countries. It is impossible to invest huge funds in the United States, Europe and Japan to carry out the comprehensive research and development of ITS, which can only be based on our ability to select the target. ITS research and application in the project.
3, institutional problem
In the field of urban transportation, due to the self-contained system of various professional transportation systems, the inter-information cannot be shared, and it hinders the full play of each sub-system benefit, and the integrated ITS is difficult to build and operate. For example, the intelligent traffic management system established by the Public Security Traffic Management Department. However, in real time monitoring road traffic, but because the bus and rental schedule system does not connect, the effective information of the public transportation system is lacking, and its system monitoring and traffic information release. vice versa. Therefore, how to organize, coordinate the competent authorities and various professional transportation systems to promote ITS research and application, become the key to the "10th Five-Year" ITS planning and application.
4. Quality issues of traffic participants
Every traffic participant's behavior affects the operational efficiency of the entire transportation system. For example, pedestrians are not bad, and the awareness of road power is not allowed. The pedestrians are in crossing the road, the streets and the underground passages are not going, and they should find shortcuts in the traffic. They will be able to limit ITS better. Play a role.
5. ITS unified planning framework and construction operation standard problem
ITS unified planning framework and construction operation standards are the premise and foundation of ITS coordinated development, related hardware equipment and software products form a huge industry. Currently, Shanghai is actively studying to develop their own ITS architecture frameworks and standards.
6, Shanghai still has a large gap compared with foreign countries in ITS technology, equipment, talent and capital investment
At present, Shanghai has mainly tracked foreign advanced technology in ITS research and development, and combined with my country's national conditions for digestion, although there is a certain foundation, the capital investment and research power is still insufficient, and the industrialization is still to start.
Second, Shanghai "10th Five-Year" ITS Development Guiding Thoughts and Construction Goals
1, guide ideology
Shanghai Development ITS should focus on traffic information, with traffic control management, public transport management informationization and intelligence into the focus of government management and service society, and develop advanced road traffic and integrated logistics and freight management systems. And the development of the Shanghai International Economic Center City development, Shanghai ITS system coordinated with social, economic and environmental development.
Shanghai ITS development should be in accordance with the principle of "unified planning, point implementation, teaching system, business integration, information sharing, strengthening service, market operation, and efficiency". Take advantage of the overall benefits of existing traffic infrastructure, adopted advanced scientific and technologies, optimize urban traffic management, logistics and freight management.
During the "10th Five-Year Plan" period, to solve the urban traffic congestion, improve traffic safety, and promote traffic information, in order to improve traffic information and intelligence in the medium and long-term, comprehensive improvement and safety of urban multi-mode traffic.
In developing ITS, actively promote the development of ITS industry, promote the complementary romance of industrial economy and ITS investment.
2. During the "10th Five-Year Plan" period, the direction of Shanghai ITS has recently formed the implementation plan of transportation and congestion, promoting urban traffic information, and initially forms the Shanghai ITS framework to establish all traffic management system information networking. Traffic information interaction center, accelerate the information construction of traffic management systems such as urban road traffic, road traffic, freight train traffic, charges, parking. For this reason? Quot; 15th "will focus on the following aspects: (1) Urban traffic informationization and information release; (2) City main road traffic transformation transformation; (3) Machine non-mixed intersection signal optimization control; (4) General information guidance and release of public transportation system; (5) Public transport electronic charges and passenger flow statistics.
The construction goals are as follows:
● Urban traffic informationization and information release
(1) Establish a central information sharing database; (2) establish a framework for integrated traffic information distribution system; (3) Establish a framework for integrated traffic information coordination system; (4) Establishing information interaction center and various traffic management center / subsystems Information exchange platform; (5) networking of each traffic management center / subsystem and traffic information interaction center.
● Urban main road traffic transmission and transformation
(1) Update and Upgrade the latest version of Scats; (2) Extend the control range of Scats; (3) Comprehensive review and optimization of existing Scats; (4) Perfect the comprehensive detection of the road traffic flow and the establishment of the center database, and information Networking with the city traffic information interactive center; (5) promotion test of green wave signal control of the main road; (6) Promotion test of regional ramp adaptive control (attention to the ground intersection); (7) Bicycle promotion intersection Signal control; (8) Extending the violation of the CCTV.
● Machine non-mixed intersection signal optimization control
(1) Test of 3 intersections before the end of 2001; (2) Bicycle signal control of the intersection of the city's main road; (3) The intersection bicycle parking line is improved, then shift 8-10 meters, let the right turn need Space; (4) Establish traffic standards for bicycle control. ● Public transportation system travel information guidance and release
(1) Establish a bus system information sharing database framework; (2) Establish a bus travel plan guide system framework; (3) Main bus set scatter, large-scale exchange points establish fixed bus information reception / release device; (4) Establish main line Publish along the line information and the in-vehicle distribution device.
● Public transportation electronic charges and passenger flow statistics
(1) Popularize public transportation electronic payment; (2) passenger flow real-time statistics of major bus lines and bus methods; (3) Network information and bus management centers and bus information sharing databases.
Third, the breakthrough of Shanghai "10th Five-Year" ITS
1. Shanghai Traffic Information Interactive Center
The Shanghai Traffic Information Interactive Center will be a key project project for ITS implementation applications, which is intended to form a central integration information interaction center. Collect the main traffic information of the transportation department, classify, analyze, process and decisions, and provide real-time travel guidance to travel through its two output systems, as well as providing the latest traffic statistics reports and decision-making recommendations to government departments and leaders. . Travel guidance information publishing can pass through electronic information, wireless broadcast, video media, GPS-GIS real-time navigation system, station / business center interactive interrogation machine, etc. 2, public transport travel information collection and distribution system
The project is a subsystem that is urgently needed under the Shanghai Public Transport Management System, which is designed to form an integrated information system, all information on Shanghai public transportation system (steam tram, subway light rail, maglev train, long-distance bus, etc.) Collect, process, release and coordinate. The completion of this system will provide a high-efficiency public transport travel information distribution network to the public, and improve the operational utilization efficiency of the bus system is one of the most dependent and convenient transportation of public transport.
3, public transportation electronic passenger flow statistics and ticket management
This project aims to provide a set of standardized, integrated passenger flow statistics and ticket management systems for public transportation networks in Shanghai, using electronic equipment to manage the number of passengers of bus vehicles. The charging system can use stored value cards, smart cards or directly from bank network systems to support, and the vehicle detector can make the driver and center dispatcher understand the number of passengers of the vehicle in real time, in-vehicle electronic reading equipment to achieve passenger charges. Electronic. The data detected and read is processed and stored immediately in the bus, and is transmitted to the Public Transport Management Center through infinite communication.
4, urban main road traffic status information collection and distribution system
The urban road traffic conditions collection and distribution system is a very important system in the recent project in Shanghai ITS. This system will focus on the real-time traffic conditions (congestion, accident, closed) of the urban (inner ring line) ground and elevated road and its upper and lower ramps. Then use various forms of information. Publishing means (such as electronic information, unlimited broadcast, car wireless navigator) along the road, intersection, ramp, etc.) to the driver's real-time traffic road conditions and navigation guidance, thereby avoiding drivers due to real-time information The lack of traffic into a congestion or has been closed, thereby reducing traffic pressure in the congestion zone.
This system should consider expansion based on the existing traffic control center, and adopt modular scalable structures, step-by-step standardization models, processing, released standardization mode.
5, high ramp and ground intersection regional adaptive signal control
This project is a subsystem under Shanghai Road Traffic Control and Management Center, which is designed to implement regional linkage control of urban elevated ramp and face-to-face signal to slow down the peak of elevated ramp and ground traffic congestion. Turn a smooth purpose. This project consists of two types of control systems: (1) The lower retragate export and the regional adaptive signal chain control of the terrestrial intersection. (2) The unified control of the upper retraction inlet region signal interlock and multiple adjacent upper ramps and the lower turn.
6, urban main road information green wave association
This project is a subsystem under Shanghai Traffic Control and Management Center, which is designed to implement signal green mode of signaling in urban main roads, so that urban channel traffic flow reaches smooth and smooth purposes. In order to cooperate with the SCATS system optimization, it is possible to consider introducing or employ other mature traffic signal control software. If the test success can be considered as one of the future SCATS debugging. The system control principle is to realize green wave associations on signals of regional trips.
Fourth, the policy and measures for the implementation of the "10th Five-Year" ITS
The implementation of Shanghai "10th Five-Year" ITS is always based on strategic planning. Under the unified coordination of organizational institutions led by the city, gradually carry out ITS implementation projects, and to organize forms, investment programs, standard regulations, institutions and environments. Coordination and optimization management of the aspects.
1. Develop strategic planning
ITS implementation should be carried out under the guidance of strategic planning. According to unified planning, unifying standards, based on the overall framework, the management is eliminated in the form of industries, and completed various tasks in the form of division of labor. 2, strengthen organizational coordination
In order to eliminate the permissions between the sectors, establish multi-sectoral functional unified standards and mutually operability ITS systems, need to establish the city's plan, information, construction, technology, transportation, public security, planning and other departments by the city leaders. The joint meeting system participating in the participation, or set up a transportation commissioning, regularly or irregular discussion, decision-making, and unifying the ITS work, and the departments shall, according to unified planning, clarify their respective work tasks, play a combined advantage, and work together.
3. Develop standards and regulations
To accelerate the development of technical standards related to traffic information systems, central database development applications, and create a convenient, reasonable information sharing environment, and promote the industrialization of traffic information resources.
4, form an investment financing main body
Shanghai ITS's investment will take the government to invest in infrastructure as the preamble, actively absorb the financial and foreign funding principles in the social and foreign funds to promote the construction of large-scale implementation projects across industries and cross-institutions. Specifically, it is to establish a government-led Shanghai ITS Investment Co., Ltd., adhere to the importance of government investment as guidance, market culture, and diversified investment channels, ensuring a certain government infrastructure investment, Take a major ITS project in cross-sectoral and cross-industry.
5. Improve the system and environment
The organization of ITS social research and industry development management of "official, production, learning, research", forming a combination of research units and professional technology development enterprises, gradually cultivating industry management agencies, and promoting ITS social management.
6, strengthen international exchanges
Establish contact channels with international ITS organizations and relevant national governments, professional associations, and experts to communicate information, communicate the latest scientific and technological achievements, and better serve Shanghai ITS construction.