Experience after being analyzed

xiaoxiao2021-03-06  69

Demand engineering is divided into two parts: demand development and demand management.

The demand development steps are as follows: 1) Product group discussing, researching products, or determining the problem domain 2) Product Group analysis problem domain, product requirements 3) Product Group Demand Demand Demand, Get << System Features Manual >> 4) Development group, test group, SQA review confirmation << System function requirements manual >> 5) Development group analysis << System function requirements manual >>, Software requirements 6) Development group Demand documentation, get << Demand Analysis Specifications >> 7) SQA Review Confirmation << Demand Analysis Specifications >> 8) SQA Forming << Requirements Tracking Matrix >>

Demand management includes the following four things: 1) According to the << Requirements Tracking Matrix >> Transferring Demand Base Laying 2) Change of Demand 3) Trackability of Maintenance Demand 4) Report Demand Status

转载请注明原文地址:https://www.9cbs.com/read-88316.html

New Post(0)