My project management process

zhaozj2021-02-16  129

This process is to study together.

Advantages of Project Management Process:

1. Object-oriented management, design, development ideas, closer to the real world, making the design clearer, more accurate demand. The implementation of the program code is more reasonable.

2. The risk control of the project is mainly controlled by the development risk of the project.

a) Priority development program main structure and human-machine interface, then communicate with customers, whether the current design has met the customer's needs, controlling the risk of demand analysis and software implementation, avoiding the software that customers don't want to use.

b) The second is to develop a planned sub-stage and set a milestone, which controls the risk from the progress. Avoid failure to deliver the goods overdue. And you can discover problems and technical risks in development in time.

c) Third, the technical risk is studied in the detailed design phase and the team leader to avoid techniques that cannot be implemented during regular basis.

d) Finally, the code check has also eliminated the hidden error in the code.

3. With a milestone development plan, combined with unit testing, object testing, and ensure the smooth implementation of the goals, and provide a guarantee for the implementation of the ultimate goal.

4. All items are divided into three layers, human-machine interface layers, control layers, basic class library layers. At the same time, the human-machine interface layer and the base class library are simultaneously performed, and the development efficiency is improved, but due to priority Developed the main framework and human-machine interface, and the fastest verification of whether the demand analysis and system design meets the needs of customers.

Code check, including check the code specification, check the code logic, eliminate errors hidden in many code, and eliminate the unregistered and unreadability of the code

My letter: Water @ Gentian.com.cn, MSN: Water@gentian.com.cn

QQ: 54499593

Interested friends discuss together.