Improvement plan for observing plan generation process

xiaoxiao2021-03-06  72

Since the current star algorithm is too large if the given day (dynamic module) is too large, the plan cannot be generated within the specified time. Because it is not possible to determine the final size of the Tianzu filtered, the feasibility of the following scheme is now considered. First, the Tianzhan that can observe daily as the original sky, which can be static elevated stars in the daytime time, and reduce the scope of the observable tiane. Then generate a TILE in each S-H star in the generated static module, and calculate the number of targets in the TILE, and the center position of each Tile and the target number are used as a linked list. After the start of the preparatory work before the night, the system self-test is complete, and the dynamic module is obtained. Then, according to the area of ​​the dynamic module, the generated linked list is then filtered. The last chain list is sorted, selecting the That as the maximum target number as the TILE of the observation plan. The TILE is distributed to obtain the desired observation plan.

转载请注明原文地址:https://www.9cbs.com/read-93321.html

New Post(0)