Planning and summary writing

xiaoxiao2021-03-06  74

I. The planned writing plan is the unit or individual to prepare a transactional instrument for the design arrangements from the goals, tasks, requests to measures in the future. (1) The species of the program can divide different types of plans from nature, content, and time. From the form of the following three types: document plan, division objectives, requirements, measures, steps, etc., writing rigorously, content and certain space; clause programs, subject to list, less involve measures, Steps, etc .; Table format plans, usually used for more and comprehensive content, which is sometimes supplemented by appropriate text descriptions, making the plan simple. The plan is a collective, like planning, outline, ideas, intended, points, programs, opinions, arrangements, etc., based on the plan target, the time is long, the content is different, and the content is determined. Planning is a plan for a long time span (more than three years), a wide range of scope and content. Example: "×× City City Construction Master Plan". The outline and planning are the same, they are all levels of leading organs at all levels based on the strategic approach to achieve long-term deployment of a region or a matter of the overall goal. Different is that the outline is more principled and summarized in planning, generally only for the direction of work, the target proposing schedule requirements and guidance measures. Example: "×× City 2000 Economic Development Outline". It is envisaged to a crude line, preliminary, preparatory informal plan. Relatively speaking, its applicable time limit is longer. Example: "×× the idea of ​​expanding the employment resettlement doorway". Plan is also a crude line, its idea is less mature. Relatively imagined, its content range is not large and takes into account the near future. Example "×× School strives to create a civilized campus". The main point is to select the main content of the plan to make it clear, it is suitable for a relatively short plan for time. Example: "×× Bureau 19 ×× Work Point". Program deploy specific careful plans from objectives, requirements, methods, methods, progress, etc. Program is generally suitable for special work, and it is often necessary to approval by superior. Example: "×× City Housing Distribution System Reform Implementation Plan". The opinion is a thick line plan, which is suitable for superiors to arrange job tasks to subside and provide basic ideas, methods, intended policies, requests. Example: "×× The company's 19 ×× annually tobacity and increase the increasing economic benefit of the company." Arrangement is done in the short term, and the range is not large, the content is single, and the specific type of plan is arranged. Example: "× × line X-week work arrangement".  (2) The plan of the plan 1, title Plan title generally consists of four parts: planned unit name, applicable time, content nature and planned name. The fifth part may occur, that is, the title of the title tail is indicated: draft, preliminary draft, comment on the opinion, review, etc. Such as "×× city 19 ×× year re-employment project implementation plan (discussion manuscript). 2. Introduction The plan usually has a "preface" paragraph, which mainly points to the guiding ideology of the formulation and the basic situation. The foreword text strives to make a concise, to clear the need to set up the plan, the feasibility of the implementation plan is to, the stress ring, empty talk. 3, the main body  If the introduction introduced "why", the body should answer "what", "how to do", "when doing" and other issues. The target and task must first explicitly point out the total objectives and basic tasks, and then, according to the actual content, the number, quality indicators of the task should then be properly written. If necessary, the indicators are given, quantitatively decompose, to make the total goal, the total task, and clear. What methods are used, what measures are used to ensure that the task is completed, which is a key ring for planned operability. The so-called way, measures are to the completion of the plan to mobilize which strength, what conditions created, which difficulties are excluded, which means, which means, etc. This requires both practical work and needs predictability, and the key is the spirit of seeking truth from facts. Only this, formulated measures, the way is specific, practical.

转载请注明原文地址:https://www.9cbs.com/read-97925.html

New Post(0)